Installation Activities Sample Clauses

Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 6: Boilers/DHW Heaters - Burner Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner controller project. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Verify that the boilers do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this project. Measured Parameters: Solar heat gain coefficient and UV(A) (ultraviolet), Visible Light (VLT), and Near Infrared (NEAR IR) transmission values for a pre-retrofit and post-retrofit windows will be measured. Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Frequency: One-time pre-retrofit measurement and One-time post-retrofit measurem...
AutoNDA by SimpleDocs
Installation Activities. Subject to the timely receipt of NuPathe’s payments as set forth in the payment schedule attached hereto as Annex 4 (the “Payment Schedule”), LTS AG shall use its Commercially Reasonable Efforts to perform the Installation Activities and to perform those in accordance with the Project Plan.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the air conditioning compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings NEMVP Option B Potential to Perform Verification and Continuous Performance Measurement Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings • Determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 ECM # Energy Conservation Measure M&V Option 4.1 Energy Management System - Temperature Setback / Optimal Start B 4.2 Energy Management System - Demand Controlled Ventilation B 4.3 Energy Management System - Exhaust Fan Control & Kitchen Hood Controls B 8 Heating System - Boiler Replacement B ECM: 4.1: Energy Management System - Temperature Setback/Optimal Start M&V Option: NEMVP-B (Continuous) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the space temperatures and unit statuses affected by the energy project. Measured Parameter: Continuous measurement of a sample set of space temperatures, space temperature set points, outdoor air temperature, and unit statuses. Interaction: Demand Control Ventilation (DCV) Measuring Equipment: Energy Management System Measurement Period: 15-minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: Post-Installation Activities: Energy Management system will continuously monitor post-retrofit outdoor air temperature, space temperature, and unit status. The date-time stamp will be included to differe...
Installation Activities a. EVGO shall, at its sole cost and expense, be responsible for all installation activities (the “Installation Activities”) required to support the operation of the Charging Station and services therewith, including furnishing and installing all materials, equipment, and labor required for the installation of the Charging Station. This includes but is not limited to all work related to the development of plans and documents for supplying power to the Charging Station per PG&E standards and CITY requirements; the hiring and coordination of all vendors and contractors; the installation of electrical equipment, utility lines, hardware, and software; and site preparation, trenching, repaving, and landscaping. Following the installation, EVGO shall activate and test the Charging Station. EVGO knows of prevailing wage requirements under the laws of the State of California and shall pay prevailing wages for all Installation Activities in accordance with those laws.
Installation Activities. Accuracy of the as-built will be verified (sampling will be conducted as detailed in the sampling procedure). A digital camera will be used to document the post-retrofit conditions. A thermal gun or an infrared camera will be used to verify installation. Visual inspections of a sample of insulation will occur annually. Formulas and values in the DEA will be used to calculate the savings ECM 5: Boilers - Replacements M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner replacement project. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period Pre-Installation Activities: A combustion efficiency test using a combustion analyzer will be performed to measure the existing operating efficiency of the boilers at a minimum 80% load.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the specifications in the DEA and meeting all functional tests and provide commissioning report for each unit An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings NEMVP Option B Potential to Perform Verification and Continuous Performance Measurement Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the Agreement needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the Agreement. Performance verification techniques involve engineering calculations with metering and monitoring. Option B:  confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings  determines an energy (and cost) savings value using measured data taken as needed throughout the M&V term. Methods employed in this option will involve the use of short or long-term measurement of one or more variables. Reference: NEMVP Version 1.0 Table 2.2.2: Option B Measures ECM # Facility Improvement Measure M&V Option ECM 3.1 Energy Management System - Temperature Setback B ECM 3.2 Energy Management System - Exhaust Fan/Relief Damper Control B ECM 3.3 Energy Management System - Demand Controlled Ventilation B ECM 3.4 Energy Management System - Optimal Start B ECM 3.1: Energy Management System - Temperature Setback M&V Option: NEMVP-B (continuous) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the spaces temperatures affected by the energy project. Measured Parameter: Continuous measurement of space temperature and outdoor air temperature Interaction: thermal and electric ECMS Measuring Equipment: Energy Management System Measuring Equipment Accuracy: ±3% of measurement range Measuring Equipment Calibration: Not applicable. Measurement Period: 15 minute samples Measurement Frequency: Continuous measurement Measurement and Verification Details: Pre-...
Installation Activities. A digital camera will primarily be used to document the pre-retrofit conditions. An infrared camera will be used to capture the thermo graphic image of pre-retrofit leaking or failed traps.
AutoNDA by SimpleDocs
Installation Activities. Accuracy of the as built will be verified. A digital camera will be used to document the post-retrofit conditions. A thermal gun or an infrared camera will be used to verify installation. Visual inspections of a sample of insulation will occur annually. Formulas and values in the DEA will be used to calculate the savings ECM 13: Heating Recovery System M&V Option: NEMVP-A Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this heat recovery system (HRS) project. Verification Period & Frequency: One-time post-retrofit period. Inspection checks for rest of the Guarantee Period.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the compressor installation to see if they meet the specifications of the DEA in terms of quantity. Formulas and assumptions in the DEA will be used to calculate the savings ECM 15: Refrigeration Compressor Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to refrigeration compressor controller project. Interaction: Electric ECMs. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: A digital camera will be used to document that a controller does not exist.
Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. Formulas and assumptions in the DEA will be used to calculate the savings ECM 16: Water Conservation M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this water conservation project. Interaction: None. Verification Method: Visual inspection of equipment operation. Verification Period & Frequency: One-time post-retrofit year. Verification Details: