Measurement Boundary definition

Measurement Boundary means the boundary drawn around whole-building meters and building systems to segregate those which are relevant to savings determination from those which are not. The Measurement Boundary shall be determined by the primary utility account and corresponding interval meters, which make up at least 90% of the Site’s electricity consumption.
Measurement Boundary means all End-User Equipment which is modified, replaced, installed, or removed as a result of the Implementation, as well as all End-User Equipment within that boundary whose energy consumption is impacted by the Implementation.
Measurement Boundary means the boundary drawn around whole-building meters and building systems to segregate those which are relevant to savings determination from those which are not. The Measurement Boundary shall be determined by the primary utility account and corresponding interval meters, which make up at least 90% of the Site’s electricity consumption.All energy uses of equipment or systems within the measurement boundary must be measured or estimated, whether the energy uses are within the boundary or not.

Examples of Measurement Boundary in a sentence

  • The EE Developer will only receive PPA payments for Efficiency Energy generated within the Measurement Boundary.

  • The following are the essential items in documenting a savings verification plan.🠮 Measurement Boundary: Define the boundary around the equipment or end use within which the savings will be verified.

  • Formulas and run hours in the DEA will be used to calculate the savings ECM 2: Lighting - Exterior Lighting M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the light fixtures subject to the lighting retrofit project.

  • The following are the essential items in documenting a savings verification plan. Measurement Boundary: Define the boundary around the equipment or end use within which the savings will be verified.

  • Formulas and values in the DEA will be used to calculate the savings ECM 11: Heating System - DHW Replacement M&V Option: NEMVP-A Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this DHW Replacement project.

  • Formulas and run hours in the DEA will be used to calculate the savings ECM 3: Building Envelope Improvements – Weatherization M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this building envelope improvement project.

  • Formulas and assumptions in the DEA will be used to calculate the savings ECM 17: Computer Management System M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to the computer management system project.

  • Formulas and values in the DEA will be used to calculate the savings ECM: 4.3: Energy Management System – Exhaust Fan/Kitchen Hood Controls M&V Option: NEMVP-B (Continuous) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the exhaust fan/kitchen hood controls affected by the energy project.

  • Formulas and values in the DEA will be used to calculate the savings ECM 13: Heating Recovery System M&V Option: NEMVP-A Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this heat recovery system (HRS) project.

  • Documenting in an M&V Plan how these requirements will be met is important so that others who subsequently become involved in the project can obtain a full understanding of the project’s history and progress.The following are the essential items in documenting a savings verification plan. Measurement Boundary: Define the boundary around the equipment or end use within which the savings will be verified.

Related to Measurement Boundary

  • Measurement Point means the emission source for which continuous emission measurement systems (CEMS) are used for emission measurement, or the cross-section of a pipeline system for which the CO2 flow is determined using continuous measurement systems;

  • Measurement means metered volumes at a custody transfer meter through a turbine, Coriolis, or such other meter.

  • natural boundary means the visible high water mark of any lake, river, stream or other body of water where the presence and action of the water are so common and usual, and so long continued in all ordinary years, as to mark on the soil of the bed of the body of water a character distinct from that of its banks, in vegetation, as well as in the nature of the soil itself.

  • Site boundary means that line beyond which the land or property is not owned, leased, or otherwise controlled by the licensee or registrant.

  • Performance Measurement Period has the meaning set forth in Section 3.1(e)(ii).

  • Boundary means any lateral or street boundary of a site;

  • Flood Boundary and Floodway Map (FBFM means an official map of a community, issued by the FEMA, on which the Special Flood Hazard Areas and the floodways are delineated. This official map is a supplement to and shall be used in conjunction with the Flood Insurance Rate Map (FIRM).

  • Motor-driven cycle means every motorcycle that has a gasoline engine that (i) displaces less than

  • Evaluation Criteria means the criteria set out under the clause 27 (Evaluation Process) of this Part C, which includes the Qualifying Criteria, Functional Criteria and Price and Preferential Points Assessment.

  • Acceptable earned value management system means an earned value management system that generally complies with system criteria in paragraph (b) of this clause.

  • ASAM criteria means the most current edition of the American Society of Addiction Medicine's published criteria for admission to treatment, continued services, and discharge.

  • Landing area means that part of a movement area intended for the landing or take-off of aircraft;

  • Standard Methods for the Examination of Water and Wastewater means the most recent edition of Standard Methods for the Examination of Water and Wastewater published jointly by the American Public Health Association, the American Waterworks Association and the Water Environment Federation;

  • Fitch Criteria means the Collateral Amount shall equal the sum of (i) the product of A multiplied by the xxxx-to-market value of the outstanding Transactions determined by Party A in good faith from time to time, and (ii) the product of B multiplied by the current aggregate notional amount of the outstanding Transactions, where:

  • Business Criteria means any one or any combination of Income before Taxes, Net Income, Return on Equity, Return on Assets, Pre-tax Margin, Free Cash Flow, Valuation or EPS.

  • Urban growth areas means those areas designated

  • Earned value management system means an earned value management system that complies with the earned value management system guidelines in the ANSI/EIA-748.

  • Structural pest control means a use requiring a license under Chapter 14 (commencing with Section 8500), Division 3, of the Business and Professions Code.

  • Sound level meter means an instrument which includes a microphone, amplifier, RMS detector, integrator or time averager, output meter, and weighting networks used to measure sound pressure levels.

  • Building level or district level leader means an individual employed by the District whose job assignment is that of a building level or district level administrator or an equivalent role, including an administrator licensed by the State Board of Education, an unlicensed administrator, or an individual on an Administrator Licensure Completion Plan. Building level or district level leader does not include the superintendent, deputy superintendents, associate superintendents, and assistant superintendents.

  • Benchmarks mean the performance milestones that are set forth in Appendix D.

  • Stormwater management basin means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management basin may either be normally dry (that is, a detention basin or infiltration basin), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Performance Monitoring System has the meaning given to it in paragraph 1.1.2 in Part B of Schedule 6 (Service Levels, Service Credits and Performance Monitoring);

  • Surface waters of the state means perennial and seasonal streams, lakes, ponds, and tidal waters within the jurisdiction of the state, including all streams, lakes, or ponds bordering on the state, marshes, water courses, and other bodies of water, natural or artificial.

  • Continuous parameter monitoring system or "CPMS" means all of the equipment necessary to meet the data acquisition and availability requirements of this article, to monitor process and control device operational parameters (for example, control device secondary voltages and electric currents) and other information (for example, gas flow rate, O2 or CO2 concentrations), and to record average operational parameter value(s) on a continuous basis.

  • ROIC means the Company’s return on Invested Capital calculated as a percentage for the twelve month period ending on the last day of the Performance Period by dividing net operating profit after tax by Invested Capital. For the purposes of calculating ROIC under this Agreement, “net operating profit” shall be adjusted to exclude the impact of all restructuring, foreign exchange, impairments, legal settlements, employee separation costs, product liability charges, pension plan and SERP terminations and retroactive tax law changes to the extent such items were not contemplated and included in the Company’s 2013-2018 Strategic Plan, upon which the ROIC goals were based.