Common use of Installation Activities Clause in Contracts

Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 6: Boilers/DHW Heaters - Burner Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner controller project. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Verify that the boilers do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this project. Measured Parameters: Solar heat gain coefficient and UV(A) (ultraviolet), Visible Light (VLT), and Near Infrared (NEAR IR) transmission values for a pre-retrofit and post-retrofit windows will be measured. Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Frequency: One-time pre-retrofit measurement and One-time post-retrofit measurement. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:

Appears in 1 contract

Samples: Agreement

AutoNDA by SimpleDocs

Installation Activities. Accuracy of the as-built will be verified (sampling will be conducted as detailed in the sampling procedure). A digital camera will be used to document the post- post-retrofit conditions. Inspect and verify the installed boilers to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer thermal gun or an infrared camera will be performed on the new boilers at a minimum 80% load used to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafterverify installation. Formulas and values in the DEA will be used to calculate the savings ECM 65: Boilers/DHW Heaters Boiler - Burner Controllers Replacements M&V OptionOption for Guarantee Year 1-18 for electrical savings: NEMVP-A (One Time) M&V Option for Guarantee Year 1 for thermal savings: NEMVP-C M&V Option for Guarantee Year 2-18 for thermal savings: NEMVP-A (One Time), only if Option C Guarantee in Year 1 is achieved Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner controller FIM. Measurement: Combustion efficiency Verification Period & Frequency: One-time the first post-retrofit year. Inspection checks for rest of the guarantee term. Post- Verification Procedure: Combustion analyzer will be used to measure combustion efficiency. A digital camera will be used to document the post- retrofit conditions. Verify if it performs in accordance with the functional specifications in the Detailed Energy Audit (DEA) and meeting all functional tests. Formulas and values in the DEA will be used to calculate the savings ECM 6: Window / Door - Replacements M&V Option for Guarantee Year 1 for thermal savings: NEMVP-C M&V Option for Guarantee Year 2-18 for thermal savings: NEMVP-A (One Time), only if Option C Guarantee in Year 1 is achieved Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this Doors and Windows replacements project. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Inspection checks for rest of the guarantee term. Pre-Installation Activities: Verify that Document the boilers do not have any burner controllers installed on them. Post- Installation Activities: A existing conditions of the old door and windows using a digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this project. Measured Parameters: Solar heat gain coefficient and UV(A) (ultraviolet), Visible Light (VLT), and Near Infrared (NEAR IR) transmission values for or a pre-retrofit and post-retrofit windows will be measured. Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Frequency: One-time pre-retrofit measurement and One-time post-retrofit measurement. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:thermal camera.

Appears in 1 contract

Samples: Performance Contract

Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers air conditioning compressor controller installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the functional specifications in the contract and meeting all functional tests. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings ECM 16 - Transformers – Replacements M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to the transformer replacements project. Interaction: All Electric ECMs. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Measure kW of a sample set of transformers that will be replaced. Post-Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify the transformer installation to see if they meet the specifications of the DEA in terms of quantity, quality and rating. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer Measure the Post kW of the same sample set of transformers from the pre measures. Measurement will be performed on before and after the new boilers at transformer is installed. An annual visual inspection of a minimum 80% load sample of units will occur to confirm that it meets specified efficiency specified ensure the equipment is still in the calculations. This will be done one time during the first heating season place and visual inspections every year thereafteroperational. Formulas and values assumptions in the DEA will be used to calculate the savings ECM 617: Boilers/DHW Heaters - Burner Refrigeration Compressor Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner the refrigeration compressor controller project. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Pre-Installation Activities: Verify Document with the digital camera that the boilers do compressor controllers are not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this project. Measured Parameters: Solar heat gain coefficient and UV(A) (ultraviolet), Visible Light (VLT), and Near Infrared (NEAR IR) transmission values for a pre-retrofit and post-retrofit windows will be measured. Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Frequency: One-time pre-retrofit measurement and One-time post-retrofit measurement. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:installed.

Appears in 1 contract

Samples: Agreement

Installation Activities. A digital camera The Post kW measurement from the first year will be used for all subsequent guarantee years. The Effective Full Load Hours (EFLH) is from published weather data and is to be used in the calculation as given in the DEA. The real time monitoring system will be used to document track performance and electrical energy production levels generated by the post- retrofit conditionssystem. Inspect An annual visual inspection will occur to ensure the equipment is still in place and verify the installed boilers to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafteroperational. Formulas and values in the DEA will be used to calculate the savings ECM 612: BoilersChiller Replacement M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the chiller plant subject to this project. Key Parameter: efficiency (kw/DHW Heaters - Burner ton) Measuring Equipment: name plate Measurement Frequency: One time during post-retrofit period Pre-Installation Activities: The efficiency of the existing chiller will be determined by the nameplate and manufactures specifications, and derated based on age and condition. Post-Installation Activities: Name plate efficiency of the new chiller will be collected and used in the calculations. An annual visual inspection will occur to ensure the equipment is still in place and operational. Formulas and values in the DEA will be used to calculate the savings ECM 13: Pool Dehumidifier Unit Replacement M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the pool dehumidifier unit subject to this project. Key Parameter: Unit Efficiency Measuring Equipment: name plate Measurement Frequency: One time during post-retrofit period Pre-Installation Activities: The efficiency of the existing unit will be determined by the nameplate and manufactures specifications, and derated based on age and condition. Post-Installation Activities: Name plate efficiency of the new unit will be collected and used in the calculations. An annual visual inspection will occur to ensure the equipment is still in place and operational. Formulas and values in the DEA will be used to calculate the savings ECM 14: Plug Load Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner controller the Plug Load Management project. Verification Period & FrequencyInteraction: One time during both pre-retrofit period and post-retrofit period. Pre-Installation ActivitiesElectric ECMs Measured Key Parameter: Verify that the boilers do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this project. Measured Parameters: Solar heat gain coefficient and UV(A) (ultraviolet), Visible Light (VLT), and Near Infrared (NEAR IR) transmission values for a pre-retrofit and post-retrofit windows will be measured. Operating Schedule Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range M&V XXXX Kit Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Verification Period & Frequency: OneOne time two weeks prior to installation and one time two weeks after installation Pre-Installation Activities: M&V XXXX Kit will be installed on 10% of the equipment that will be controlled for a period of two weeks to establish the baseline operating schedule. Post-Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify the XXXX installation to see if they meet the specifications of the contract in terms of quantity and functionality. Once the Xxxx plugs are installed, schedules are established and operational; we will collect usage schedule data for two week period and compare it to the baseline to validate savings. An annual visual inspection of a sample of units will occur to ensure the equipment is still in place and operational. Formulas and assumptions in the DEA will be used to calculate the savings ECM 15: Air Conditioning Compressor Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to air conditioning compressor controller project. Interaction: Electric ECMs. Verification Period & Frequency: One time during both pre-retrofit measurement period and One-time post-retrofit measurementperiod. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:Post-Installation Activities: A digital camera will be used to document that a controller does not exist.

Appears in 1 contract

Samples: Agreement

Installation Activities. A digital thermal camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers doors and windows to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 67: Boilers/DHW Heaters Motors - Burner Controllers Replacements M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner controller motor replacement project. Interaction: None. Pre-Installation Activities: Document the existing conditions of the old motors using a digital camera. Post- Installation Activities: JCI will verify the efficiency of the newly installed motor. A digital camera will be used to document the post- retrofit conditions one time. Inspection checks for rest of the guarantee term. Formulas and values in the DEA will be used to calculate the savings ECM 10: Unit Ventilators - Refurbishment M&V Option for Guarantee Year 1-18 for electrical savings: NEMVP-A (One Time) M&V Option for Guarantee Year 1 for thermal savings: NEMVP-C M&V Option for Guarantee Year 2-18 for thermal savings: NEMVP-A (One Time), only if Option C Guarantee in Year 1 is achieved Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this unit ventilator refurbishment project. Interaction: All thermal ECMs. Verification Period & Frequency: One time during both pre-retrofit period and post-retrofit period. Inspection checks for rest of the guarantee term. Pre-Installation Activities: Verify that the boilers do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit existing conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Option: NEMVP-A (One Time) Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this project. Measured Parameters: Solar heat gain coefficient and UV(A) (ultraviolet), Visible Light (VLT), and Near Infrared (NEAR IR) transmission values for a pre-retrofit and post-retrofit windows will be measured. Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Frequency: One-time pre-retrofit measurement and One-time post-retrofit measurement. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:.

Appears in 1 contract

Samples: Performance Contract

AutoNDA by SimpleDocs

Installation Activities. A digital camera will primarily be used to document the post-retrofit conditions. An infrared camera will be used to capture the thermo graphic image of post retrofit thermal leaks. Linear footage of weatherization will be measured using a measuring tape. Visual inspections of a sample set for the remainder of the M&V Services Period. Formulas and values in the DEA will be used to calculate the savings EEM 5: Unit Ventilator Replacement M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this unit ventilator replacement project. Verification Period & Frequency: One-time the first post-retrofit year. Pre-Installation Activities: A digital camera will primarily be used to document the pre-retrofit conditions. The existing condition of the unit ventilators will be documented with pictures prior to removal. Post- Verification Procedure: A digital camera will be used to document the post- retrofit conditions on a sample of units. Inspect and verify the unit ventilator replacements to see if they meet the specifications of the DEA in terms of quantity. Formulas and assumptions in the DEA will be used to calculate the savings ECM 6 –RTU Replacement M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to RTU replacement project. Verification Period & Frequency: One-time the first post-retrofit year. Pre-Installation Activities: A digital camera will primarily be used to document the pre-retrofit conditions. The existing condition of the RTU will be documented with pictures prior to removal. Post- Verification Procedure: A digital camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers RTU installation to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA , quality and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafterrating. Formulas and values assumptions in the DEA will be used to calculate the savings ECM 67 – Energy Efficient Motors Replacements M&V Option: BoilersNEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this motor replacement project. Verification Period & Frequency: One-time the first post-retrofit year. Pre-Installation Activities: A digital camera will primarily be used to document the pre-retrofit conditions. The existing condition of the motors will be documented with pictures prior to removal. Post- Verification Procedure: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed motors to see if they meet the specifications of the DEA in terms of quantity, quality and efficiency rating. Formulas and assumptions in the DEA will be used to calculate the savings ECM 9: Heating System – Boiler/DHW Heaters - Burner Controllers M&V Option: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner boiler/DHW controller project. Verification Period & Frequency: One One-time during both pre-retrofit period and the first post-retrofit periodyear. Pre-Installation Activities: Verify that the boilers boilers/DHW do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler boilers/DHW controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 710: Windows - Window Film Steam Traps – Replacements M&V Option: NEMVP-A (One Time) Measurement Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films items that are subject to this steam trap project. Measured ParametersVerification Equipment: Solar heat gain coefficient and UV(A) (ultraviolet)Infrared camera, Visible Light (VLT)thermal gun, and Near Infrared (NEAR IR) transmission values for a pre-retrofit and digital camera Verification Period & Frequency: One time during post-retrofit windows will be measured. Measuring Equipment: Solar heat gain profiler Measuring Equipment Accuracy: ±5% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration year in Customer’s presence and at the a time of measurement and documented in the M&V report. Measurement Period: 10-second average Measurement Frequency: One-time pre-retrofit measurement and One-time post-retrofit measurement. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:agreed to by Customer.

Appears in 1 contract

Samples: Performance Contract

Installation Activities. A digital camera will be used to document the post- retrofit conditions. Inspect and verify the installed boilers refrigeration compressor controller installation to see if they meet the specifications of the DEA in terms of quantity. Verify if they perform in accordance with the functional specifications in the DEA and meeting all functional tests and provide commissioning report for each unit. A combustion efficiency test using a combustion analyzer will be performed on the new boilers at a minimum 80% load to confirm that it meets specified efficiency specified in the calculations. This will be done one time during the first heating season and visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings 2.2.3 NEMVP Option B M&V Plan: NEMVP Option B: Retrofit Isolation Potential to Perform Verification and Continuous Performance Measurement Option B is for projects where: i) the potential to perform and generate savings needs to be verified, and ii) actual performance during the term of the contract needs to be measured (verified). Option B involves procedures for verifying the same items as Option A plus actual achieved energy savings during the term of the M&V period. Performance verification techniques involve engineering calculations with metering and monitoring. Option B: • Confirms that the proper equipment/systems were installed and that they have the potential to generate the predicted savings. • Determines an energy (and cost) savings value using measured data taken throughout the term of the contract. Methods employed in this option will involve the use of long-term measurement of one or more variables. Table 0.0.0.0: Option B Measures ECM 6# Measure M&V Option ECM 3.1 Energy Management System - Temperature Setback B ECM 3.2 Energy Management System - Demand Controlled Ventilation B ECM 3.3 Energy Management System - Optimal Start B ECM 8 Renewable Energy- Photovoltaic Electric Generation B ECM 9 Plug Load Controllers B ECM 3.1: Boilers/DHW Heaters Energy Management System - Burner Controllers Temperature Setback M&V OptionOption for Guarantee Year 1 for thermal savings: NEMVP-A (One Time) Verification Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the items that are subject to this boiler burner controller project. Verification Period & Frequency: One time during both preC M&V Option for Guarantee Year 2-retrofit period and post-retrofit period. Pre-Installation Activities: Verify that the boilers do not have any burner controllers installed on them. Post- Installation Activities: A digital camera will be used to document the post- retrofit conditions. Inspect and verify installed boiler controllers to see if they meet the specifications of the contract in terms of quantity, quality and rating. Verify if they perform in accordance with all functional tests and provide start up and check out report 18 for each unit. Visual inspections every year thereafter. Formulas and values in the DEA will be used to calculate the savings ECM 7: Windows - Window Film M&V Optionthermal savings: NEMVP-A B (One Time) Continuous), only if Option C Guarantee in Year 1 is achieved Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the window films subject to this spaces temperatures affected by the energy project. Measured ParametersParameter: Solar heat gain coefficient Continuous measurement of a sample set of space temperature, space temperature set point and UV(A) (ultraviolet), Visible Light (VLT), outdoor air temperature Interaction: with Optimal Start and Near Infrared (NEAR IR) transmission values for a pre-retrofit and post-retrofit windows will be measured. DCV Measuring Equipment: Solar heat gain profiler Energy Management System Measuring Equipment Accuracy: ±5±3% of measurement range Measuring Equipment Calibration: Equipment will be quality checked for calibration at the time of measurement and documented in the M&V reportNot applicable. Measurement Period: 10-second average 15 minute samples Measurement Frequency: One-time pre-retrofit Continuous measurement and One-time post-retrofit measurement. Inspection checks for remainder of the M&V Services Period. Measurement and Verification Details:: Pre-Installation Activities: During detail audit on site it was documented that the interior temperature was maintained at occupied levels all day and night. Post-Installation Activities: Energy Management system will continuously monitor post-retrofit space temperature and outside air temperature. The date-time stamp will be included to differentiate occupied/unoccupied and summer/winter periods. Xxxxxxx Controls will also monitor and record the setpoint changes during the Measurement and Verification (M&V) period. Formulas and values in the DEA will be used to calculate the savings ECM 3.2: Energy Management System – Demand Controlled Ventilation M&V Option for Guarantee Year 1 for thermal savings: NEMVP-C M&V Option for Guarantee Year 2-18 for thermal savings: NEMVP-B (Continuous), only if Option C Guarantee in Year 1 is achieved Measurement Boundary: Retrofit isolation – Project savings will be determined within the measurement boundary that encompasses only the spaces temperatures and unit status affected by the energy project. Measured Parameter: Continuous measurement of a sample set of CO2 levels and damper position (if available).

Appears in 1 contract

Samples: Performance Contract