Examples of Change Order Request in a sentence
As more specifically described in Paragraph 7.7 below, a Change Order Request (“COR”) is a written document originated by the Design-Build Entity, supported by backup documentation which describes an instruction issued by the Owner after the effective date of the Contract, which the Design-Build Entity believes to be a Scope Change that may result in changes to the Contract Sum or Contract Time or, which describes the need for or desirability of a change in the Work proposed by the Design-Build Entity.
Any oral order, direction, instruction, interpretation, or determination from the Owner which, in the opinion of the Design-Builder, causes a Change in the Work, or otherwise requires an adjustment to the Contract Sum or the Contract Time, shall be treated as a Change Order Request only if the Design-Builder gives the Owner written notice within ten (10) calendar days of the order, direction, instruction, interpretation, or determination.
Overhead, including direct and indirect costs, shall be submitted with the Change Order Request and shall be fully inclusive of: home office overhead, off-site supervision, Change Order preparation/negotiation/research, time delays, project interference and disruption, additional guaranty and warranty durations, on- Site supervision, additional temporary protection, additional temporary utilities, additional material handling costs, and additional safety equipment costs.