SEQUENCE OF WORK Sample Clauses

SEQUENCE OF WORK. 13.9.1 A schedule of the Contractor's work shall be submitted to the City for approval as required under Article V of the Agreement. It shall contain a listing of the order in which the Contract items will be constructed and the approximate dates for starting and finishing each Contract item.
AutoNDA by SimpleDocs
SEQUENCE OF WORK. Excavation, cleaning, laying, jointing and backfilling shall be kept up as closely as is possible so as to progress in a uniform, workmanlike manner. In no case shall pipe be left in the trench overnight, without completing jointing. The completed pipe line shall not be left exposed in the trench unnecessarily and the Contractor will be required to backfill and compact the trench as soon as possible after jointing and laying is completed. The Contractor shall keep exposed ends of pipe properly plugged during laying to prevent dirt and other materials entering the line. Each day at the close of work, and at all times when laying is not in progress the exposed end of the pipe line in the trench shall be closed by the use of an approved header or barrier of wood or metals. If at any time it becomes necessary to cover the ends of an uncompleted pipe line with backfill, the end of such pipe line shall be closed, using a header with mechanical joint plug.
SEQUENCE OF WORK. Contract specifications shall be completed and inspected on a unit-by-unit basis. No work shall be done on a succeeding block until acceptance of work on the preceding unit, unless agreed to in writing by the Officer-in-Charge ** Work shall not start in blocks located within wildlife restriction buffer areas until after August 1st. or as approved by Wildlife Department. Tribal –specified sequence of work is as follows: Priority Block Acres Restriction Estimated Start Date # Calendar Days Allowed na PC/BRKSS5/75 24.3 None 24 na PC/SS5-1/71 101.5 None 100 na PC/SS5-2/71 87.9 None 86 Totals: 213.7 210 The Contractor shall notify the Tribe prior to starting work on any unit. By this notification, spacing requirements, stream courses, slash treatment, and other items may be discussed prior to the start of work on each unit. The Tribe may specify a priority of work by unit.
SEQUENCE OF WORK. If required by the special provisions, the Contractor shall start construction operations on that part of the project designated by the Public Works Director.
SEQUENCE OF WORK. 3.1.1 Carry out work of this section sequentially. Complete each activity before proceeding to the next.
SEQUENCE OF WORK. The Contractor shall make every effort to complete the work in a manner and fashion that minimizes closures and inconveniences to the public. Once barricades are placed, the CONTRACTOR shall show progress of work during normal working days and hours. The contract documents are compiled to support the efficient operations of the Contractor and are not intended to supplant the Contractor's responsibility of superintendence. Special consideration regarding schedules and/or work sequences necessary or anticipated during the course of the project will be identified in the Special Provisions. SPECIFICATIONS THE STANDARD SPECIFICATIONS GOVERNING THIS PROJECT SHALL BE THE "CITY OF CHEYENNE/BOARD OF PUBLIC UTILITIES CONSTRUCTION SPECIFICATIONS AND STANDARD DRAWINGS, 2007" WITH APPROVED AMENDMENTS ISSUED BY THE CITY ENGINEER AT THE TIME OF THIS CONTRACT. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP CURRENT ON THESE AMENDMENTS. COPIES OF THESE AMENDMENTS ARE AVAILABLE IN THE OFFICE OF THE CITY ENGINEER.
SEQUENCE OF WORK. 1 The work shall include but not be limited to the following: .1 Raking out, collection, and disposal of existing mortar. .2 Taking down and rebuilding displaced masonry. .3 Repairing damaged stone. .4 Backpointing of joints. .5 Pointing of joints in repaired stone. .6 Pointing of scaffold tie holds.
AutoNDA by SimpleDocs
SEQUENCE OF WORK. 1 Refer to sequence of work specified in Section 04050, Masonry Procedures.
SEQUENCE OF WORK. OWNER reserves the right to schedule sequence of construction; that is, which portion of the project will be constructed first. The contractor may perform construction operations during daylight hours only, unless written approval is given by the ENGINEER and the OWNER. All existing utilities to remain operational during all construction activities.
SEQUENCE OF WORK. D18.1 Further to C6.1, the sequence of work on Rue Des Meurons shall be as follows: D18.1.1 The Work shall be divided into two (2) phases.