Tenant Delay Days definition

Tenant Delay Days means each day of delay in the performance of Landlord’s Work that occurs (a) because Tenant fails to timely furnish any information or deliver or approve any required documents such as the plans (whether preliminary, interim revisions or final), pricing estimates, construction bids, and the like, (b) because of any change by Tenant to the plans, (c) because Tenant fails to attend any meeting with Landlord, the architect, any design professional, or any contractor, or their respective employees or representatives, as may be required or scheduled hereunder or otherwise necessary in connection with the preparation or completion of any construction documents, such as the plans, or in connection with the performance of Landlord’s Work, (d) because of any specification by Tenant of materials or installations in addition to or other than Landlord’s standard finish-out materials, or (e) because Tenant otherwise delays completion of Landlord Work.
Tenant Delay Days means each day after January 16, 1995, that final, acceptable Working Days are not delivered to Landlord (if such Working Drawings are not delivered by noon on a business day, then they shall be deemed delivered on the next business day), and days of delay caused by (1) changes in the Working Drawings after final approval by Tenant and Landlord, (2) Tenant's failure to notify Landlord whether it approves or disapproves of a contractor within three business days, (3) any specification by Tenant of materials or installations which are not readily available or whose installation is materially more time consuming than Building-standard finish work, provided that Landlord promptly notifies Tenant thereof, and (4) the action or inaction of Tenant or its agents or contractors (the contractors described in Section 2 of this Exhibit are not Tenant's contractors). Tenant shall use all reasonable efforts to promptly move into the Premises after they are tendered to Tenant, but Tenant shall not be required to move on days other than Saturday or Sunday. PARKING Tenant shall be permitted to use 18 vehicular parking spaces in the parking garage in the building (the "PARKING GARAGE") during the initial Term subject to such terms, conditions and regulations as are from time to time applicable to patrons of the Parking Garage. Tenant may from time to time elect for such spaces to be reserved or undesignated by delivering to Landlord prior written notice thereof; however, an election for reserved spaces shall be subject to the availability thereof when such election is made. Each election shall be effective as of the first day of the month following the date Landlord receives written notice of Tenant's election. Tenant initially elects to use four reserved spaces. The rates applicable to the parking spaces shall be the following amount for the following months of the Term: =============================================================================== Months Reserved Undesignated ------------------------------------------------------------------------------- 1 - 36 $110 $0.00 ------------------------------------------------------------------------------- 37-48 $110 $50 ------------------------------------------------------------------------------- 49-72 $195 $75 ------------------------------------------------------------------------------- Renewal Term Market Market ================================================================================ Tenant shall be entitled to ...
Tenant Delay Days means each day of delay in the performance of the Work which is directly attributable to the affirmative acts or willful refusal to reasonably cooperate of Tenant or the employees, agents or contractors of Tenant, and “Force Majeure Delay Days” means each day of delay in the performance of the Work that occurs for the reasons specified in Section 25.3 of this Lease. By occupying the Premises, Tenant shall be deemed to have accepted the Premises in their condition as of the date of such occupancy, subject to the performance of punch-list items that remain to be performed by Landlord, if any. Prior to occupying the Premises, Tenant shall execute and deliver to Landlord a letter substantially in the form of Exhibit E hereto confirming (A) the Commencement Date and the expiration date of the initial Term, (B) that Tenant has accepted the Premises, and (C) that Landlord has performed all of its obligations with respect to the Premises (except for punch-list items specified in such letter that are the responsibility of Landlord pursuant to the express terms and conditions of this Lease); however, the failure of the parties to execute such letter shall not defer the Commencement Date or otherwise invalidate this Lease. Entry into the Premises by any Tenant Party prior to the Commencement Date shall be subject to all of the provisions of this Lease excepting only those requiring the payment of Basic Rent and Additional Rent and before Tenant may occupy the Premises to conduct business therein, Tenant shall, at its expense, obtain and deliver to Landlord a certificate of occupancy from the appropriate governmental authority for the Premises. 1 0000 XXXXXXXX XXXXXXXXXXXX XXXXXXXX XXXXX, XX 00000 4812-0074-7958.V2

Examples of Tenant Delay Days in a sentence

  • In the event that either Landlord or Tenant disputes in good faith the amount of the Total Landlord Delay Days or the Total Tenant Delay Days, such dispute shall be resolved by arbitration pursuant to Section 21.15 of the Lease.

  • Notwithstanding the foregoing, Tenant shall receive a credit toward Base Rent in the amount of two (2) times the daily Base Rent due, for each day that Landlord’s Delivery of the Premises in compliance with this Lease is delayed beyond the Estimated Commencement Date (excluding any Tenant Delay Days), which credit shall be applied beginning on the actual Commencement Date and thereafter until fully exhausted.

  • That is the representational form of domain knowledge (Silver, 2000).

  • Notwithstanding the terms of this Section 3, if Landlord fails to construct the Dock as required pursuant to Exhibit D within ninety (90) days after full execution and delivery of this Lease (extended on a day for day basis by Tenant Delay Days), Tenant may terminate this Lease by providing written notice to Landlord within ten (10) days following such ninety (90) day period, but in any event prior to Landlord's construction of the Dock.

  • If the Commencement Date shall not occur by March 31, 2015 and provided such delay is not the result of Tenant Delay Days, in addition to the Abatement provided in Subsection C(ii) of this Article 1, Tenant’s obligation to pay Rent and Additional Rent shall be abated one (1) day for each day thereafter until Landlord’s Work is Substantially Completed.

  • In the event Landlord’s Delivery of the Premises in compliance with this Lease is delayed beyond the Estimated Commencement Date by more than one (1) year (excluding any Tenant Delay Days), Tenant may terminate this Lease upon written notice to Landlord.


More Definitions of Tenant Delay Days

Tenant Delay Days means the number of days of delay for Substantial Completion caused by (a) any acts of a Tenant Party, (b) changes requested by Tenant in the approved Interior Drawings, or (c) any specifications by Tenant of materials or installations which are not readily available. If Substantial Completion is delayed because of Tenant Delay Days, then the Term Commencement Date shall not be extended, but rather shall start on the date on which Substantial Completion would have occurred but for such Tenant Delay Days. As a clarification to the foregoing, and notwithstanding the provisions of Section 2.3(c) hereof setting forth certain review and response periods with respect to the Interior Drawings, if Tenant for any reason fails to deliver to Landlord, on or before Friday, January 9, 1998, preliminary plans for the Interior Improvements ("Tenant's Preliminary Plans") in form reasonably satisfactory for Landlord to prepare (or cause its architect to prepare) the Interior Drawings, each day after January 9, 1998, for which Xxxxxx fails to furnish Tenant's Preliminary Plans to Landlord shall be a Tenant Delay Day for purposes of determining the Term Commencement Date hereunder; if Tenant for any reason fails to approve Landlord's initial Interior Drawings (prepared in accordance with Tenant's Preliminary Plans) within five (5) business days after the date Landlord delivers such initial Interior Drawings to Tenant, each day after such fifth day until Tenant finally approves the Interior Drawings shall be a Tenant Delay Day for purposes of determining the Term Commencement Date hereunder; and if Tenant at any time after submission of Xxxxxx's Preliminary Plans to Landlord changes any item with respect to the Tenant's Preliminary Plans, the number of days of delay caused thereby shall constitute Tenant Delay Days for purposes of determining the Term Commencement Date hereunder.

Related to Tenant Delay Days

  • Tenant Delay as used in the Lease or this Agreement shall mean any delay that Landlord may encounter in the performance of Landlord’s obligations under the Lease or this Agreement because of any act or omission of any nature by Tenant or its agents or contractors, including any: (1) delay attributable to changes in or additions to the Approved Plans or to the Landlord’s Work requested by Tenant; (2) delay attributable to the postponement of any Landlord’s Work at the request of Tenant; (3) delay caused by a Change Order requested by Tenant; (4) delay attributable to the failure of Tenant to pay, when due, any amounts required to be paid by Tenant pursuant to the Lease; or (5) delay attributable to a failure of Tenant to employ union labor for Tenant’s work at the Premises during the time the Landlord’s Work is being constructed. Tenant shall pay all actual costs and expenses incurred by Landlord which result from any Tenant Delay and the Commencement Date of the Lease shall be accelerated one (1) day for each day the Premises is not Ready for Occupancy as a result of a Tenant Delay. No Tenant Delay shall be deemed to have occurred unless Landlord gives Tenant prior written notice or written notice within five (5) days of the occurrence, as reasonable under the circumstances, specifying the claimed reasons for such Tenant Delay, and Tenant shall fail to promptly correct or cure such Tenant Delay. There shall be excluded from the number of days of any Tenant Delay, or any of the following events of force majeure: labor disputes, fire, unusual delay in transportation, adverse weather conditions not reasonably anticipatable, unavoidable casualties, delays in obtaining permits or governmental approvals or any other causes beyond Landlord’s or its contractor’s reasonable control (and other than for financial reasons) (collectively, “Force Majeure Delays”).

  • Tenant Delays means delays caused by: (i) requirements of the Plans and Specifications requested by Tenant that do not conform to Landlord’s building standards for office and lab build-out, or which contain long lead-time or non-standard items requested by Tenant; provided that Landlord has notified Tenant of such deviations upon execution of this Lease (ii) any material change in the Plans and Specifications requested by Tenant and agreed to by Landlord; (iii) any request by Tenant for a delay in the commencement or completion of the Initial Tenant Improvements for any reason; (iv) Tenant delay in finalizing and approving the design of the vivarium and value engineering of same or (v) any other act or omission of Tenant or its employees, agents or contractors which reasonably inhibits the Landlord from timely completing the Initial Tenant Improvements including, without limitation any delays caused by Tenant’s presence in the Premises prior to the Term Commencement Date. The Premises shall not be deemed to be incomplete if only minor or insubstantial details of construction, decoration or mechanical adjustments remain to be done which do not unreasonably interfere with Tenant’s occupancy of the Premises. If as a result of Tenant Delays the Premises are deemed ready for Tenant’s occupancy, pursuant to the foregoing (and the term shall have commenced by reason thereof), but the Premises are not in fact actually ready for Tenant’s occupancy, Tenant shall not (except with Landlord’s consent not to be unreasonably withheld, conditioned or delayed) be entitled to take possession of the Premises for the permitted use until the Premises are in fact actually ready for such occupancy.

  • Landlord Delay shall occur if either: (i) Landlord fails to complete the Base Building and/or other improvements on the Project that are required by the DDA, the Parking REA and/or the CC&Rs, and as a direct result of such failure Tenant is unable to obtain a temporary or permanent certificate of occupancy for the Premises upon substantial completion of the Tenant Improvements; or (ii) substantial completion of the Warm Shell Improvements or Tenant Improvements is delayed directly and solely as a result of any of the following and such delay could not have been mitigated by Tenant using commercially reasonable measures, which delay occurs after the Delivery Date and before the Commencement Date and does not result from Tenant's interference or delay in connection with completion of the Tenant Improvements or after a Tenant Default or Work Letter Draw Event: (a) subject to Paragraph 8 above, unreasonable interference by Landlord or Landlord's Contractor with the construction of the Warm Shell Improvements or the Tenant Improvements; (b) Landlord's failure to comply with any deadlines for response to, or submissions from, Tenant as required by this Work Letter; (c) any material Discretionary Changes to Landlord's Plans or the Warm Shell Plans after their final approval by applicable governmental entities (other than Tenant Modifications) that directly affect Tenant's Plans or the Tenant Improvements; and/or (d) Landlord failure to complete portions of the Base Building and/or other improvements on the Project that are Landlord's obligation to complete hereunder, and as a direct result of such failure Tenant and Tenant's contractors do not have access to the Premises to the extent required to complete the Warm Shell Improvements and/or Tenant Improvements. Tenant shall give Landlord at least five (5) days prior notice if Tenant becomes aware that Landlord is in danger of causing a Landlord Delay, and if Landlord takes appropriate measures to prevent such delay within such five (5) day period, no adjustment to the Commencement Date shall be made on account of such Landlord; provided, however, that if such delay was not reasonably foreseeable by Tenant, the five (5) day period for prior notice and opportunity to mitigate provided above shall be changed to forty-eight (48) hours after Tenant becomes aware of such delay or potential delay.

  • Force Majeure Delay means with respect to the Servicer, any cause or event which is beyond the control and not due to the negligence of the Servicer, which delays, prevents or prohibits such Person’s delivery of the reports required to be delivered or the performance of any other duty or obligation of the Servicer under the Indenture, as the case may be, including, without limitation, computer, electrical and mechanical failures, acts of God or the elements and fire; provided, that no such cause or event shall be deemed to be a Force Majeure Delay unless the Servicer shall have given the Indenture Trustee written notice thereof as soon as practicable after the beginning of such delay.

  • Force Majeure Delays means any actual delay in the construction of the Tenant Improvements, which is beyond the reasonable control of Landlord or Tenant, as the case may be, as described in Paragraph 33 of the Lease.

  • Landlord’s Work means the work of constructing the Tenant Improvements.

  • Building Work has the meaning given to it in section 6 of the Building and Construction Industry (Improving Productivity) Act 2016 (Cth);

  • Force Majeure Failure has the meaning set forth in Section 8.1(d).

  • Landlord Work means the work, if any, that Landlord is obligated to perform in the Premises pursuant to a separate agreement (the “Work Letter”), if any, attached to this Lease as Exhibit C.

  • Substantial Completion Date means the date on which Substantial Completion occurs.

  • Unavoidable Delay means an event which delays Closing which is a strike, fire, explosion, flood, act of God, civil insurrection, act of war, act of terrorism or pandemic, plus any period of delay directly caused by the event, which are beyond the reasonable control of the Vendor and are not caused or contributed to by the fault of the Vendor. “Unavoidable Delay Period” means the number of days between the Purchaser’s receipt of written notice of the commencement of the Unavoidable Delay, as required by paragraph 5(b), and the date on which the Unavoidable Delay concludes.

  • Base Building Work means the base building work for the Building as described in this Manual.

  • Substantial Completion means the stage in the progress of the work as determined and certified by the Contracting Officer in writing to the Contractor, on which the work (or a portion designated by the Government) is sufficiently complete and satisfactory. Substantial completion means that the property may be occupied or used for the purpose for which it is intended, and only minor items such as touch-up, adjustments, and minor replacements or installations remain to be completed or corrected which:

  • Quarterly Commencement Date means the 1st day of each of April, July, October and January in each year.

  • Tenant’s Work means all improvements, alterations, fixture, equipment, and signage installation, and furniture placement necessary or appropriate for the conduct of the Permitted Use, including all work described as Tenant’s Work on Exhibit D, attached (the “Work Letter”).

  • Excusable Delay means a delay due to acts of God, governmental restrictions, stays, judgments, orders, decrees, enemy actions, civil commotion, fire, casualty, strikes, work stoppages, shortages of labor or materials or other causes beyond the reasonable control of Borrower, but lack of funds in and of itself shall not be deemed a cause beyond the control of Borrower.

  • Unavoidable Delays means delays due to any of the following, and only the following, (provided that such delay is beyond Construction Manager’s reasonable control): war, insurrection, civil commotion, strikes, slowdowns, lock outs, riots, flood, earthquakes, fires, casualties, acts of God, acts of a public enemy, acts of terrorism, epidemics, quarantine restrictions, freight embargoes, lack of transportation, governmental moratoriums, unusually severe or abnormal weather conditions, failure of utilities, or a court order which causes a delay (unless resulting from a wrongful act of Construction Manager). In no event shall the application to Construction Manager of any applicable law, regulation, rule or other governmental requirement constitute an Unavoidable Delay. Contractor shall use reasonable good faith efforts to notify Owner not later than five (5) days after Construction Manager knows of the occurrence of an Unavoidable Delay. An extension of time for an Unavoidable Delay shall only be for the period of the Unavoidable Delay, which period shall commence to run from the time of the commencement of the cause of the Unavoidable Delay.

  • Construction Commencement Date means the date set out in the Addendum, if applicable, by which you must commence construction of the Hotel. For the Hotel to be considered under construction, youmust have begun to pour concrete foundations for the Hotel or otherwise satisfied any site-specific criteria for “under construction” set out in the Addendum.

  • Excusable Delays means delays due to acts of terrorism, acts of war or civil insurrection, strikes, riots, floods, earthquakes, fires, tornadoes, casualties, acts of God, labor disputes, governmental restrictions or priorities, embargoes, national or regional material shortages, failure to obtain regulatory approval from any Federal or State regulatory body, unforeseen site conditions, extraordinary rainfall or snowfall, or any other condition or circumstances beyond the reasonable or foreseeable control of the applicable Party using reasonable diligence to overcome which prevents such Party from performing its specific duties or obligation hereunder in a timely manner; provided, however, Excusable Delay does not include lack of financing, unanticipated or unexpected increases in the costs of construction, or errors in business judgment by a Party; and provided further that Excusable Delay shall only extend the time of performance for the period of such Excusable Delay, which shall begin on the date which the event of Excusable Delay first occurs and extend until the date which the event which has caused the Excusable Delay has been corrected or performed, or reasonably should have been corrected or performed.

  • Prior Occupancy means Owner’s use of all or parts of the Project before Substantial Completion, as more fully set forth in Section 6.08 A.

  • Occupancy Date means the date on which occupancy of all Units in a Project is permitted;

  • DAY WORK means on item of work requiring the employment of labour with or without materials as the case may be, which, in the opinion of the Senior Engineer /Civil-in-charge, is not capable of being evaluated by the accepted methods of measurement or assessment and is paid for on the basis of the actual labour and materials utilised on the particular item of work referred to.

  • Construction Period means the period commencing from the Appointed Date and ending on the date of the Completion Certificate;

  • Tenant Improvement Allowance in the maximum amount of $200.00 per rentable square foot in the Premises, which is included in the Base Rent set forth in the Lease; and

  • Tenant Improvements Defined in Exhibit B, if any.

  • Lease Commencement Date has the meaning specified in Section 3.2 of the Master Lease.