Inspection Tower Sample Clauses

Inspection Tower. The CONTRACTOR shall construct an inspection tower at each Temporary Debris Site within three (3) calendar days of natural disaster. The tower shall be constructed using pressure treated wood or steel scaffold. The floor elevation of the tower shall be 10-feet above the existing ground elevation. The floor area shall be a minimum 8' by 8', constructed of 2"x 8" joists, 16" O.C. with 3/4" plywood supported by a minimum of four 6" x 6" posts. A 4-foot high wall constructed of 2" x 4" studs and ½” plywood shall protect the perimeter of the floor area. The floor area shall be covered with a roof. The roof shall provide a minimum of 6'-6" of headroom below the support beams. Steps with a handrail shall provide access to the tower. Inspection towers must provide a dry area for employees and meet all FEMA OSHA requirements.
AutoNDA by SimpleDocs
Inspection Tower. The Contractor shall construct an inspection tower at each debris storage site as requested by the Municipality. The tower shall be constructed using pressure treated wood or metal scaffolding. The floor elevation of the tower shall be 10-feet above the existing ground elevation. The floor area shall be a minimum 8' by 8', constructed of 2"x 8" joists, 16" O.C. with 3/4" plywood supported by a minimum of four 6" x 6" posts. A 4-foot high wall constructed of 2" x 4" studs and ½” plywood shall protect the perimeter of the floor area. The floor area shall be covered with a roof. The roof shall provide a minimum of 6'-6" of headroom below the support beams. Steps with a handrail shall provide access to the tower. Tower shall be built in accordance with approved Municipality building standards and shall be inspected by the Municipality building inspector’s office.
Inspection Tower. 4.4.1 The contractor shall construct an inspection tower at each TDSR site. The floor elevation of the tower shall be 10-feet above the existing ground elevation. The floor area shall be a minimum 8 feet by 8 feet, constructed of 2 inch x 8 inch joists, 16 inch on-center with ¾ inch plywood supported by a minimum of four 6 inch x 6 inch posts. A 4-foot high wall constructed of 2 inch x 4 inch studs and ½ inch plywood shall protect the perimeter of the floor area. The floor area shall be covered with a roof. The roof shall provide a minimum of 6 feet – 6 inches of headroom below the support beams. Steps with a handrail shall provide access to the tower. Tower will be anchored to the ground to prevent blow-over. Construction alternatives may be authorized by the Debris Manager but will, as a minimum, provide the same dimensions and safety considerations.
Inspection Tower. The CONTRACTOR shall construct an inspection tower at each Temporary Debris Management Site. The tower shall be constructed using pressure treated wood or metal scaffolding. The floor elevation of the tower shall be 10-feet above the existing ground elevation. The floor area shall be a minimum 3' by 6'. If wood is used, it will be constructed of 2"x 8" joists, 16" O.C. with 3/4" plywood supported by a minimum of four 6" x 6" posts. A 4-foot high wall constructed of 2" x 4" studs and plywood shall protect the perimeter of the floor area. The floor area shall be covered with a roof. The roof shall provide a minimum of 6'- 6" of headroom below the support beams. Steps with a handrail shall provide access to the tower. The Inspection Tower shall be firmly anchored to the ground to avoid blow over in high winds. The CONTRACTOR shall be responsible for ensuring that the towers meet or exceed appropriate code requirements. A scissors lift may be used for the first several days of operations, and only until such time as construction of the Inspection Tower is complete. The CONTRACTOR shall provide portable sanitary facilities at each Temporary Debris Management Site. Hazardous Waste Containment Area The CONTRACTOR shall construct a hazardous material containment area at each Temporary Debris Management Site. This area shall be 30' x 30'. The perimeter shall be lined with hay xxxxx, or similar absorbent, and staked in place. The area shall be lined with a heavy gage plastic to provide a waterproof barrier. Additional plastic sufficient to cover the area is required to prevent rain from entering the containment area. Site run-off must be redirected from the containment area by site grading. The CONTRACTOR has the option of replacing the containment pit with a wet tight/water proof hazardous waste container large enough to handle all household hazardous waste without exceeding its capacity.
Inspection Tower. This tower is a structure placed in the vicinity of the entrance to the DMS for all incoming delivery loads and outgoing disposal loads to be inspected and documented. The load tower should be sized sufficiently high to enable inspection into the top of an eighteen wheel transfer trailer and large enough for at least four (4) people.
Inspection Tower. (If Required) The Contractor shall construct an inspection tower at each debris storage site as requested by the Town of Nags Head. The tower shall be constructed using pressure treated wood or metal scaffolding. The floor elevation of the tower shall be 10-feet above the existing ground elevation. The floor area shall be a minimum 8' by 8', constructed of 2"x 8" joists, 16" O.C. with 3/4" plywood supported by a minimum of four 6" x 6" posts. A 4-foot high wall constructed of 2" x 4" studs and ½” plywood shall protect the perimeter of the floor area. The floor area shall be covered with a roof. The roof shall provide a minimum of 6'-6" of headroom below the support beams. Steps with a handrail shall provide access to the tower. Tower shall be built in accordance with approved Town of Nags Head building standards and shall be inspected by the Town of Nags Head building inspector’s office.

Related to Inspection Tower

  • INSPECTION OF PREMISES Landlord and Landlord's agents shall have the right at all reasonable times during the term of this Agreement and any renewal thereof to enter the Premises for the purpose of inspecting the Premises and all buildings and improvements thereon. And for the purposes of making any repairs, additions or alterations as may be deemed appropriate by Landlord for the preservation of the Premises or the building. Landlord and its agents shall further have the right to exhibit the Premises and to display the usual "for sale", "for rent" or "vacancy" signs on the Premises at any time within forty-five (45) days before the expiration of this Lease. The right of entry shall likewise exist for the purpose of removing placards, signs, fixtures, alterations or additions, that do not conform to this Agreement or to any restrictions, rules or regulations affecting the Premises.

  • Inspections The Servicer shall inspect the Mortgaged Property as often as deemed necessary by the Servicer in accordance with Accepted Servicing Practices to assure itself that the value of the Mortgaged Property is being preserved. In addition, if any Mortgage Loan is more than 45 days delinquent, the Servicer promptly shall inspect the Mortgaged Property and shall conduct subsequent inspections in accordance with Accepted Servicing Practices or as may be required by the primary mortgage guaranty insurer. Upon request, the Servicer shall produce an electronic report of each such inspection.

  • Inspection Testing Authorization and Right of Access 2.1 Equipment Testing and Inspection 2.2 Authorization Required Prior to Parallel Operation

  • INSPECTION OF SITE 1) The Contractor shall be deemed to have inspected the Site prior to the submission of his tender and to have satisfied himself as to the nature of the ground, the access to the Site, the availability of water, electricity and labour and all other factors affecting the execution and completion of the Works and to have allowed for all these factors in preparing his tender.

  • INSPECTION AND REJECTION 8.1 Purchaser shall have the right to inspect and test Products at any time prior to shipment, and within a reasonable time after delivery to the Purchaser’s Destination. Products not inspected within a reasonable time after delivery shall be deemed accepted by Purchaser. The payment for Products shall in no way impair the right of Purchaser to reject nonconforming Products, or to avail itself of any other remedies to which it may be entitled.

  • Inspection Rights Permit representatives and independent contractors of the Administrative Agent and each Lender to visit and inspect any of its properties, to examine its corporate, financial and operating records, and make copies thereof or abstracts therefrom, and to discuss its affairs, finances and accounts with its directors, officers, and independent public accountants (subject to such accountants’ customary policies and procedures), all at the reasonable expense of the Borrower and at such reasonable times during normal business hours and as often as may be reasonably desired, upon reasonable advance notice to the Borrower; provided that, excluding any such visits and inspections during the continuation of an Event of Default, only the Administrative Agent on behalf of the Lenders may exercise rights of the Administrative Agent and the Lenders under this Section 6.10 and the Administrative Agent shall not exercise such rights more often than two times during any calendar year and only one (1) such time shall be at the Borrower’s expense; provided, further, that when an Event of Default exists, the Administrative Agent or any Lender (or any of their respective representatives or independent contractors) may do any of the foregoing at the expense of the Borrower at any time during normal business hours and upon reasonable advance notice. The Administrative Agent and the Lenders shall give the Borrower the opportunity to participate in any discussions with the Borrower’s independent public accountants. Notwithstanding anything to the contrary in this Section 6.10, none of the Borrower nor any Restricted Subsidiary shall be required to disclose, permit the inspection, examination or making copies or abstracts of, or discussion of, any document, information or other matter that (i) constitutes non-financial trade secrets or non-financial proprietary information, (ii) in respect of which disclosure to the Administrative Agent or any Lender (or their respective representatives or contractors) is prohibited by Law or (iii) is subject to attorney-client or similar privilege or constitutes attorney work-product.

  • Environmental Inspection at End of Agreement Term A. At Authority’s discretion, at least one hundred and twenty (120) days before the expiration or early termination of the Term as provided herein, Company will conduct an environmental inspection and examination of the Company Premises. At its discretion, Authority may complete environmental reviews to determine if recognized environmental conditions exist that could warrant soil and groundwater sampling. If warranted by the findings of Company or Authority’s inspection or if requested by Authority, a compliance audit or site assessment will be performed within the aforementioned time period by a qualified professional acceptable to Authority who will report the findings to Authority. The cost for professional consulting or engineering services required for such audit will be at the expense of Company. If a site assessment is conducted, Company agrees to pay all associated laboratory and testing fees incurred to test and analyze samples collected during the site assessment process. The Authority may also choose to conduct the compliance audit or site assessment. If the results of the assessment indicate that the Company Premises have been impacted by the release of Hazardous Substances, Company will immediately take such action as is necessary and will provide a substantial guaranty in a form and content acceptable to Authority that Company will clean up the contamination at its own expense, at no expense to Authority, and in accordance with Applicable Laws to the extent that it is obligated to do so by virtue of the foregoing provisions of this Article.

Time is Money Join Law Insider Premium to draft better contracts faster.