Gross Calorific Value (GCV) & Fuel Cost. The price of the coal is directly proportional to the gross calorific value. The GCV proposed by the petitioner is 4338 KCal/kg. The GoAP issued orders dated 13-03-2014 permitting all sugar xxxxx having co-generation facility capable of running with coal to generate power using coal as fuel during non-crushing season from the date of issue of orders till the start of next crushing season and supply to DISCOMs at the rate fixed by the APERC. The GoAP did not specify the kind of coal to be utilized. However, the petitioner has opted to utilize the higher priced Indonesian coal for generation of power as per GO dated 13-03- 2014. As such, the risk of the developer’s option for utilizing higher purchase price Indonesian coal shall not be passed on to APDISCOMs, which in turn will unduly burden the end consumers. Further, the coal price requested by the appellant is based on the quotation from M/s. Star Coal India (P) Ltd., and the same cannot be relied upon since the quotation is not authenticated. Hence, the Commission is requested to peruse the original receipts/bills from the coal supplier throughout the period of generation using coal. In addition, the appellant has claimed GCV of 4338 KCal/kg for the coal utilized for power generation at 4875/MT (inclusive of transportation and VAT). It is ascertained that the basic price/tonne with GCV ranging from 4301 to 4600 from the Singareni Collieries Company Ltd., is as follows: GCV grade of coal GCV Range (KCal/kg) ROM Coal `/MT Steam Coal `/MT Slack Coal `/MT Crushed ROM Coal `/MT G 10 4301 to 4600 2100 2430 2130 2190 As seen from the above, the maximum price for the coal with GCV of 4338 K Cal/kg is `2430/MT, and adding 20% (say) towards other charges viz., transportation, VAT etc., the coal price comes to around `3000/MT. With this coal price and GCV, the variable cost comes to `2.73/unit. If the eligible fixed cost of `1.39/unit (the CoD of the plant is 12-03-2010 and the plant is in 5th year of operation) is added, the total comes to `4.12/unit. As per the quotation furnished by the petitioner, the GCV is 5000 KCal/kg and with this the variable cost comes `3.50/unit and the total cost comes to `4.89/unit (`3.50+`1.39). Even otherwise APPCC is purchasing power from other developers generating power using imported Indonesian coal under short term basis at `5.45/unit. As such Commission may determine the purchase price with a variable cost of `2.73/unit and the total cost of `4.12/unit.
AutoNDA by SimpleDocs

Related to Gross Calorific Value (GCV) & Fuel Cost

  • CAISO Monthly Billed Fuel Cost [for Geysers Main only] The CAISO Monthly Billed Fuel Cost is given by Equation C2-1. CAISO Monthly Billed Fuel Cost Equation C2-1 = Billable MWh ◆ Steam Price ($/MWh) Where: • Steam Price is $16.34/MWh. • For purposes of Equation C2-1, Billable MWh is all Billable MWh Delivered after cumulative Hourly Metered Total Net Generation during the Contract Year from all Units exceeds the Minimum Annual Generation given by Equation C2-2. Equation C2-2 Minimum Annual Generation = (Annual Average Field Capacity ◆ 8760 hours ◆ 0.4) - (A+B+C) Where: • Annual Average Field Capacity is the arithmetic average of the two Field Capacities in MW for each Contract Year, determined as described below. Field Capacity shall be determined for each six-month period from July 1 through December 31 of the preceding calendar year and January 1 through June 30 of the Contract Year. Field Capacity shall be the average of the five highest amounts of net generation (in MWh) simultaneously achieved by all Units during eight-hour periods within the six-month period. The capacity simultaneously achieved by all Units during each eight-hour period shall be the sum of Hourly Metered Total Net Generation for all Units during such eight-hour period, divided by eight hours. Such eight-hour periods shall not overlap or be counted more than once but may be consecutive. Within 30 days after the end of each six-month period, Owner shall provide CAISO and the Responsible Utility with its determination of Field Capacity, including all information necessary to validate that determination. • A is the amount of Energy that cannot be produced (as defined below) due to the curtailment of a Unit during a test of the Facility, a Unit or the steam field agreed to by CAISO and Owner. • B is the amount of Energy that cannot be produced (as defined below) due to the retirement of a Unit or due to a Unit’s Availability remaining at zero after a period of ten Months during which the Unit’s Availability has been zero. • C is the amount of Energy that cannot be produced (as defined below) because a Force Majeure Event reduces a Unit’s Availability to zero for at least thirty (30) days or because a Force Majeure Event reduces a Unit’s Availability for at least one hundred eighty (180) days to a level below the Unit Availability Limit immediately prior to the Force Majeure Event. • The amount of Energy that cannot be produced is the sum, for each Settlement Period during which the condition applicable to A, B or C above exists, of the difference between the Unit Availability Limit immediately prior to the condition and the Unit Availability Limit during the condition.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • ESTIMATED / SPECIFIC QUANTITY CONTRACTS Estimated quantity contracts, also referred to as indefinite delivery / indefinite quantity contracts, are expressly agreed and understood to be made for only the quantities, if any, actually ordered during the Contract term. No guarantee of any quantity is implied or given. With respect to any specific quantity stated in the contract, the Commissioner reserves the right after award to order up to 20% more or less (rounded to the next highest whole number) than the specific quantities called for in the Contract. Notwithstanding the foregoing, the Commissioner may purchase greater or lesser percentages of Contract quantities should the Commissioner and Contractor so agree. Such agreement may include an equitable price adjustment.

  • Long Term Cost Evaluation Criterion # 4 READ CAREFULLY and see in the RFP document under "Proposal Scoring and Evaluation". Points will be assigned to this criterion based on your answer to this Attribute. Points are awarded if you agree not i ncrease your catalog prices (as defined herein) more than X% annually over the previous year for years two and thr ee and potentially year four, unless an exigent circumstance exists in the marketplace and the excess price increase which exceeds X% annually is supported by documentation provided by you and your suppliers and shared with TIP S, if requested. If you agree NOT to increase prices more than 5%, except when justified by supporting documentati on, you are awarded 10 points; if 6% to 14%, except when justified by supporting documentation, you receive 1 to 9 points incrementally. Price increases 14% or greater, except when justified by supporting documentation, receive 0 points. increases will be 5% or less annually per question Required Confidentiality Claim Form Required Confidentiality Claim Form This completed form is required by TIPS. By submitting a response to this solicitation you agree to download from th e “Attachments” section, complete according to the instructions on the form, then uploading the completed form, wit h any confidential attachments, if applicable, to the “Response Attachments” section titled “Confidentiality Form” in order to provide to TIPS the completed form titled, “CONFIDENTIALITY CLAIM FORM”. By completing this process, you provide us with the information we require to comply with the open record laws of the State of Texas as they ma y apply to your proposal submission. If you do not provide the form with your proposal, an award will not be made if your proposal is qualified for an award, until TIPS has an accurate, completed form from you. Read the form carefully before completing and if you have any questions, email Xxxx Xxxxxx at TIPS at xxxx.xxxxxx@t xxx-xxx.xxx

  • Total Cost It is estimated that the total cost to Princeton University for the performance of this Contract shall not exceed the Not-to-Exceed Price set forth in the Contract and the Contractor agrees to use its best efforts to perform the Work specified in the Contract and all obligations under this Contract within such Not-to- Exceed Price. If at any time the Contractor has reason to believe that the hourly rate payments and material costs that will accrue in performing this Contract in the next succeeding thirty (30) days, if added to all other payments and costs previously accrued, will exceed eighty-five percent (85%) of the Not-to-Exceed Price in the Contract, the Contractor shall notify Princeton University giving a revised estimate of the total price for performing this Contract with supporting reasons and documentation. If at any time during performing this Contract, the Contractor has reason to believe that the total price to Princeton University for performing this Contract will be substantially greater or less than stated Not-to-Exceed Price, the Contractor shall so notify Princeton University, giving a revised estimate of the total price for performing this Contract, with supporting reasons and documentation. If at any time during performance of this Contract, Princeton University has reason to believe that the cost required to perform the Work of this Contract will be substantially greater or less than the stated Not-to-Exceed Price, Princeton University will so advise the Contractor, giving the then- revised estimate of the total amount of effort to be required under the Contract.

  • Fuel Surcharge NO FUEL SURCHARGES allowed during the term of this contract or any of its extensions. The Successful Contract will not xxxx Xxxxxxx County for any fuel surcharges throughout the term of this contract and its extensions.

  • Construction Cost Estimate At 50% completion of the contract documents, the design team will present and submit copies of the project plans and manual. The Construction Administrator will prepare and issue the fourth of five construction cost estimates. The estimate shall be derived from actual takeoffs, subcontractor and vendor input, and material and labor cost data. All quantitative systems information shall be provided in detail.

  • Revenue Metering The Connecting Transmission Owner’s revenue metering will be located on the generator side of the 115kV breaker at the Xxxxx Solar Collector Substation and will consist of: • three (3) combination current/voltage transformer (“CT/VT”) units (manufacturer and model ABB/Xxxxxxx KXM-550, GE Grid Solutions KOTEF 000.XX, or other equivalent specified by Connecting Transmission Owner); and • one (1) revenue meter. The ratios of the CTs and VTs will be provided by Connecting Transmission Owner upon its review of the Interconnection Customer’s design documents. (Note: Connecting Transmission Owner’s revenue metering CTs and VTs cannot be used to feed the Interconnection Customer’s check meter.) SERVICE AGREEMENT NO. 2556

  • Project Cost a. The estimated cost of the Project is $ 97,740.00. This amount is based upon the Schedule of Financial Assistance in Exhibit "B", attached to and incorporated in this Agreement. Exhibit “B” may be modified by mutual execution of an amendment as provided for in paragraph 5.i.

  • Excellent Above Average Satisfactory Needs Improvement Unsatisfactory 5 4 3 2 1 5. The instructor demonstrates knowledge of the subject matter.