Changes in Drawings and Specifications Sample Clauses

Changes in Drawings and Specifications. If at any time after the Drawings and Specifications are approved or deemed approved by Tenant, Tenant desires to change the Drawings and Specifications, Tenant shall submit to Landlord for approval working drawings and specifications for any and all such desired changes, provided that any delay in the commencement or completion of the Tenant Improvements as a result of any such changes requested by Tenant shall be deemed to constitute a Tenant Delay hereunder. The process of finalizing and approving such drawings and specifications shall be substantially the same as those procedures which applied to the submission, review and approval of the original Drawings and Specifications pursuant to Section 2, above. Once any and all changes and modifications are approved, Landlord shall promptly submit the same to Landlord’s Contractor for pricing. The procedure for determining an approved cost for such changes shall be as set forth in Section 2 above. Once the cost for such changes has been approved, all references in this Agreement to “Drawings and Specifications” shall be to the Drawings and Specifications adopted pursuant to the procedures of Section 2 above, as changed and modified pursuant to this Section. Once the changes and the costs therefor have been approved, Tenant shall be deemed to have given full authorization to Landlord to proceed with the work of constructing and installing the Tenant Improvements (and any Tenant Work to be performed by Landlord at Tenant’s expense) in accordance with the Drawings and Specifications, as so changed and modified. Landlord shall have the optional right to require Tenant to pay in one lump sum to Landlord, in advance of commencement of work, any and all net increases in the Tenant Improvement Costs which result from approved changes to the Drawings and Specifications.
AutoNDA by SimpleDocs
Changes in Drawings and Specifications. Landlord, at its option, may require Tenant to pay in lump sum to Landlord any and all increases in the Tenant Improvement Costs which result from approved changes to the Drawings and Specifications. Any delays in completing the Tenant Improvements which result from either changes in the Drawings and Specifications made by Tenant or from the unavailability of materials specified by Tenant, shall not operate to delay or extend the Commencement Date under the Lease nor the payment of the Base Monthly Rental or other charges due under this Lease.
Changes in Drawings and Specifications. INEOS KOH reserves the right to make any changes in the Plans and Specifications by giving written notice thereof to Contractor. If such changes cause a material increase or decrease in the cost of performing the work or the time of performance, and written notice thereof is given to either party within ten (10) days after the giving of such notice of change, an equitable adjustment in the Agreement Price and/or the time of performance shall be made. The adjustment shall be in the form of an agreed upon lump sum or the actual cost of the work plus an agreed upon allowance for contractor’s overhead and profit or an agreed upon unit price.
Changes in Drawings and Specifications. If at any time after the Tenant Improvement Costs are determined Tenant desires to make changes in the Drawings and Specifications, Tenant shall submit to Landlord for approval working drawings, specifications, and finish schedules for any and all such desired changes. The process of finalizing such drawings and the like shall be as set forth in Section 2 above. Once any and all changes and modifications are approved, Landlord shall promptly submit the same to Landlord's Contractor for pricing. The procedure for determining an approved cost for such changes shall be as set forth in Section 2 above. Once a cost for such changes has been approved, all references in this Agreement to "Drawings and Specifications" shall be to the

Related to Changes in Drawings and Specifications

  • Construction Drawings After approving the Additional Programming Information, Landlord shall cause the Architect and the Engineers to prepare and deliver to Tenant Construction Drawings that conform to the approved Space Plan and the approved Additional Programming Information. Such preparation and delivery shall occur within 15 business days after the later of Landlord’s approval of the Additional Programming Information or the mutual execution and delivery of this Agreement. Tenant shall approve or disapprove the Construction Drawings by notice to Landlord. If Tenant disapproves the Construction Drawings, Tenant’s notice of disapproval shall specify any revisions Tenant desires in the Construction Drawings. After receiving such notice of disapproval, Landlord shall cause the Architect and/or the Engineers to revise the Construction Drawings, taking into account the reasons for Tenant’s disapproval (provided, however, that Landlord shall not be required to cause the Architect or the Engineers to make any revision to the Construction Drawings that is inconsistent with the Landlord Requirements or that Landlord otherwise reasonably disapproves), and resubmit the Construction Drawings to Tenant for its approval. Such revision and resubmission shall occur within five (5) business days after the later of Landlord’s receipt of Tenant’s notice of disapproval or the mutual execution and delivery of this Agreement if such revision is not material, and within such longer period of time as may be reasonably necessary (but not more than 15 business days after the later of such receipt or such mutual execution and delivery) if such revision is material. Such procedure shall be repeated as necessary until Tenant has approved the Construction Drawings. The Construction Drawings approved by Landlord and Tenant are referred to in this Work Letter as the “Approved Construction Drawings”.

  • Plans and Specifications Tenant shall be solely responsible for the preparation of the final architectural, electrical and mechanical construction drawings, plans and specifications (called “plans”) necessary for Tenant to construct the Premises for Tenant’s occupancy, which plans shall be subject to approval by Landlord’s architect and engineers and shall comply with their reasonable requirements to avoid aesthetic or other conflicts with the design and function of the balance of the Building. Landlord’s approval is solely given for the benefit of Landlord, and neither Tenant nor any third party shall have the right to rely upon Landlord’s approval of Tenant’s plans for any purpose whatsoever other than that Landlord does not object thereto under this Lease. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan submission by Tenant within 8 business days after Landlord’s receipt thereof. If Landlord fails to respond to any such submission within such 8 business day period, which failure continues for more than 2 business days after Tenant gives Landlord a written notice (the “Deemed Approved Notice”) advising Landlord that such plan submission shall be deemed approved within 2 business days of Landlord’s receipt of the Deemed Approved Notice, then such plan submission shall be deemed approved hereunder. The Deemed Approved Notice shall, in order to be effective, contain on the first page thereof, in a font at least twice as large as the font of any other text contained in such notice, a legend substantially as follows: “FAILURE TO RESPOND TO THIS NOTICE WITHIN TWO (2) BUSINESS DAYS AFTER RECEIPT HEREOF SHALL CONSTITUTE LANDLORD’S APPROVAL OF SUBMITTED PLANS.” In the event Landlord’s architect’s or engineers’ approval of Tenant’s plans is withheld or conditioned, Landlord shall send prompt written notification thereof to Tenant and include a reasonably detailed statement identifying the reasons for such refusal or condition, and Tenant shall promptly have the plans revised by its architect to incorporate all reasonable objections and conditions presented by Landlord and shall resubmit such plans to Landlord. Landlord’s architects and engineers shall respond (with approval or disapproval) to any plan re-submission by Tenant within 8 business days after Landlord’s receipt thereof. Such process shall be followed until the plans shall have been approved by Landlord’s architect and engineers without unreasonable objection or condition. Without limiting the foregoing, Tenant shall be responsible for all elements of the design of Tenant’s plans (including, without limitation, compliance with law, functionality of design, the structural integrity of the design, the configuration of the Premises and the placement of Tenant’s furniture, appliances and equipment), and Landlord’s approval of Tenant’s plans shall in no event relieve Tenant of the responsibility for such design. Tenant agrees it shall be solely responsible for the timely preparation and submission of all such plans and for all elements of the design of such plans and for all costs related thereto. (The word “architect” as used in this Section 3.2 shall include an interior designer or space planner.) Tenant shall reimburse Landlord Landlord’s reasonable out-of-pocket expense incurred in connection with the review of Tenant’s plans.

  • APPROVAL OF PLANS AND SPECIFICATIONS The Plans and Specifications will conform to the requirements and conditions set out by applicable law or any effective restrictive covenant, and to all governmental authorities which exercise jurisdiction over the Leased Premises or the construction thereon.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.