Resource and referral definition

Resource and referral means services that provide assistance to parents in choosing child care; it may include assessment of the family’s child care needs, collection and maintenance of information about their needs in the community and efforts to increase the supply and to improve quality of child care.

Examples of Resource and referral in a sentence

  • Resource and referral agencies shall use this information when deciding whether to make a referral to the licensee and shall maintain the confidentiality of information provided to them pursuant to this section.

  • In these documents, the term university is used to refer to both colleges and universities.

  • Resource and referral should be coordinated with United Way 211, Connecticut’s free information and referral service.

  • Resource and referral services are provided through contract with the 8 Child Care Resource and Referral Service agencies (Maine Resource Development Centers).

  • Resource and referral, including providing information and linking families to needed services.

  • Administrative activities do not include: • Eligibility determination and re-determination;• Preparation and participation in judicial hearings;• Child care placement;• Recruitment, licensing, and supervision of child care placements;• Rate setting;• Resource and referral services;• Training of child care staff; and• Establishment and maintenance of child care information systems.

  • In the event of removal of program we will refer you to either the YMCA Child Care Resource and referral at 630.790.8137 (ymcadupage.org/) or Action for Children at 312.823.1200 (actforchildren.org).

  • Grantees were asked to identify consumer education activities they plan to implement from the following list: Resource and referral services; Resource library for parents and providers; Newsletters for providers and parents; Parent handbooks; Toy lending library; and Internet-based consumer education on quality child care.

  • Employers in providing assistance to employees in locating or providing child care.[Formerly 418.346; 1995 c.278 §4; 2007 c.70 §287] 657A.130 Resource and referral agency requirements.

  • Resource and referral programs, grants or loans to assist in meeting state and localstandards, monitoring of compliance with licensing and regulatoryrequirements, training, andcompensation are allowable quality activities under this minimum fourpercent requirement.

Related to Resource and referral

  • Stormwater management planning area means the geographic area for which a stormwater management planning agency is authorized to prepare stormwater management plans, or a specific portion of that area identified in a stormwater management plan prepared by that agency.

  • Stormwater management system means any equipment, plants,

  • Stormwater management means the programs to maintain quality and quantity of stormwater runoff to pre-development levels.

  • Stormwater management plan means the set of drawings and other documents that comprise all the information and specifications for the programs, drainage systems, structures, BMPs, concepts and techniques intended to maintain or restore quality and quantity of stormwater runoff to pre-development levels.

  • Contact therapy system means a therapeutic radiation machine with a short target to skin distance (TSD), usually less than five centimeters.

  • Stormwater management BMP means an excavation or embankment and related areas designed to retain stormwater runoff. A stormwater management BMP may either be normally dry (that is, a detention basin or infiltration system), retain water in a permanent pool (a retention basin), or be planted mainly with wetland vegetation (most constructed stormwater wetlands).

  • Stormwater management measure means any practice, technology, process, program, or other method intended to control or reduce stormwater runoff and associated pollutants, or to induce or control the infiltration or groundwater recharge of stormwater or to eliminate illicit or illegal non-stormwater discharges into stormwater conveyances.

  • Stormwater management planning agency means a public body authorized by legislation to prepare stormwater management plans.

  • Cultural resources means archaeological and historic sites and artifacts, and traditional religious, ceremonial and social uses and activities of affected Indian tribes.

  • Comprehensive resource analysis means an analysis including,

  • Total resource cost test or "TRC test" means a standard that is met if, for an investment in energy efficiency or demand-response measures, the benefit-cost ratio is greater than one. The benefit-cost ratio is the ratio of the net present value of the total benefits of the program to the net present value of the total costs as calculated over the lifetime of the measures. A total resource cost test compares the sum of avoided electric utility costs, representing the benefits that accrue to the system and the participant in the delivery of those efficiency measures, as well as other quantifiable societal benefits, including avoided natural gas utility costs, to the sum of all incremental costs of end-use measures that are implemented due to the program (including both utility and participant contributions), plus costs to administer, deliver, and evaluate each demand-side program, to quantify the net savings obtained by substituting the demand-side program for supply resources. In calculating avoided costs of power and energy that an electric utility would otherwise have had to acquire, reasonable estimates shall be included of financial costs likely to be imposed by future regulations and legislation on emissions of greenhouse gases.

  • Spatial Planning and Land Use Management Act means the Spatial Planning and Land Use Management Act, 2013 (Act 16 of 2013);

  • Service(s)(ing) In accordance with Regulation AB, the act of servicing and administering the Mortgage Loans or any other assets of the Trust by an entity that meets the definition of “servicer” set forth in Item 1101 of Regulation AB and is subject to the disclosure requirements set forth in Item 1108 of Regulation AB. For clarification purposes, any uncapitalized occurrence of this term shall have the meaning commonly understood by participants in the commercial mortgage-backed securities market.

  • Resource conservation means the reduction in the use of water, energy, and raw materials. (Minn. Stat. § 115A.03, Subd. 26a)

  • Resource means assets and income.

  • Genetic services means a genetic test, genetic counseling (including obtaining, interpreting, or assessing genetic information), or genetic education.

  • New Jersey Stormwater Best Management Practices (BMP) Manual or “BMP Manual” means the manual maintained by the Department providing, in part, design specifications, removal rates, calculation methods, and soil testing procedures approved by the Department as being capable of contributing to the achievement of the stormwater management standards specified in this chapter. The BMP Manual is periodically amended by the Department as necessary to provide design specifications on additional best management practices and new information on already included practices reflecting the best available current information regarding the particular practice and the Department’s determination as to the ability of that best management practice to contribute to compliance with the standards contained in this chapter. Alternative stormwater management measures, removal rates, or calculation methods may be utilized, subject to any limitations specified in this chapter, provided the design engineer demonstrates to the municipality, in accordance with Section IV.F. of this ordinance and N.J.A.C. 7:8-5.2(g), that the proposed measure and its design will contribute to achievement of the design and performance standards established by this chapter.

  • Resources shall have the meaning set forth in Section 23.1 of this Agreement.

  • Virginia Stormwater Management Program or “VSMP” means a program approved by the State Board after September 13, 2011, that has been established by a locality to manage the quality and quantity of runoff resulting from land-disturbing activities and shall include such items as local ordinances, rules, permit requirements, annual standards and specifications, policies and guidelines, technical materials, and requirements for plan review, inspection, enforcement, where authorized in this article, and evaluation consistent with the requirements of this article and associated regulations.

  • resource main means (subject to Section 219(2) of the 1991 Act) any pipe, not being a trunk main, which is or is to be used for the purpose of-

  • Supply Chain Management All aspects of supply chain management, from the initial sourcing phase through customer delivery (e.g., procurement, sourcing management, inventory management, catalog management, ordering/purchasing, invoice tracking, storefront/shopping cart, warehouse management, returns management, logistics/transportation).

  • Project Management Agreement means the agreement dated the 20th February 1985 made between the Trustee and the Manager providing for the Manager to manage and co‑ordinate the development and construction of the Resort and includes, if that agreement is terminated, any other agreement in like and similar terms made with the prior consent of the Minister;

  • Outreach Services has the meaning ascribed thereto in Section 2.1(F)(5) hereof and Exhibit B hereto.

  • Search and rescue means the acts of searching for, rescuing, or recovering by means of ground, marine, or air activity any person who becomes lost, injured, or is killed while outdoors or as a result of a natural, technological, or human caused disaster, including instances involving searches for downed aircraft when ground personnel are used. Nothing in this section shall affect appropriate activity by the department of transportation under chapter 47.68 RCW.

  • Virginia Stormwater Management Act means Article 2.3 (§ 62.1-44.15:24 et seq.) of Chapter 3.1 of Title 62.1 of the Code of Virginia.