Geological and Archeological Specimens Sample Clauses

Geological and Archeological Specimens. If, during the execution of the Work, the Contractor, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Contractor acknowledges that title to the foregoing is vested in the Owner. The Contractor shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the Contractor shall be addressed under the provision for changed conditions. The Contractor agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.
AutoNDA by SimpleDocs
Geological and Archeological Specimens. If, during the execution of the Work, the Design-Builder, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Design-Builder acknowledges that title to the foregoing is vested in the Owner. The Design-Builder shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Program Manager. Any additional cost incurred by the Design-Builder shall be addressed under the provision for changed conditions. The Design-Builder agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.
Geological and Archeological Specimens. If, during the execution of the Work, the CM/GC, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the CM/GC acknowledges that title to the foregoing is vested in the Owner. The CM/GC shall notify the Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the CM/GC shall be addressed under the provision for changed conditions. The CM/GC agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times. SECTION 3CONSTRUCTION PHASE
Geological and Archeological Specimens. If CM/GC, any Subcontractor, employee, or agent of either should uncover any valuable material or materials, including but not limited to treasure trove, geological specimens, archival material, archeological specimens, or ore, then CM/GC acknowledges that title to the foregoing is vested in Owner. CM/GC shall notify Owner upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from Design Professional. Any additional cost incurred by CM/GC shall be addressed under the provision for changed conditions.
Geological and Archeological Specimens. If, during the execution of the Work, the CMR, any Subcontractor, or any servant, employee, or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the CMR acknowledges that title to the foregoing is vested in the Board. The CMR shall notify the Board upon the discovery of any of the foregoing, shall take reasonable steps to safeguard it, and seek further instruction from the Design Professional. Any additional cost incurred by the CMR shall be addressed under the provision for changed conditions. The CMR agrees that the Geological and Water Resources Division and the Historic Preservation Division of the Georgia Department of Natural Resources may inspect the Work at reasonable times.
Geological and Archeological Specimens. If during the execution of the work the Construction Manager, and Trade Contractor, or any servant, employee or agent of either should uncover any valuable material or materials, such as, but not limited to, treasure trove, geological specimens, archival material, archeological specimens, or ore, the Construction Manager acknowledges that title to the foregoing is vested in the Owner. The Construction Manager shall notify the Owner upon the discovery of any of the foregoing, shall safeguard it, and shall deliver it promptly to the Owner.

Related to Geological and Archeological Specimens

  • Geological and archaeological finds It is expressly agreed that mining, geological or archaeological rights do not form part of this Agreement with the Contractor for the Works, and the Contractor hereby acknowledges that it shall not have any mining rights or interest in the underlying minerals, fossils, antiquities, structures or other remnants or things either of particular geological or archaeological interest and that such rights, interest and property on or under the Site shall vest in and belong to the Authority or the concerned Government Instrumentality. The Contractor shall take all reasonable precautions to prevent its workmen or any other person from removing or damaging such interest or property and shall inform the Authority forthwith of the discovery thereof and comply with such instructions as the concerned Government Instrumentality may reasonably give for the removal of such property. For the avoidance of doubt, it is agreed that any reasonable expenses incurred by the Contractor hereunder shall be reimbursed by the Authority. It is also agreed that the Authority shall procure that the instructions hereunder are issued by the concerned Government Instrumentality within a reasonable period.

  • For Product Development Projects and Project Demonstrations  Published documents, including date, title, and periodical name.  Estimated or actual energy and cost savings, and estimated statewide energy savings once market potential has been realized. Identify all assumptions used in the estimates.  Greenhouse gas and criteria emissions reductions.  Other non-energy benefits such as reliability, public safety, lower operational cost, environmental improvement, indoor environmental quality, and societal benefits.  Data on potential job creation, market potential, economic development, and increased state revenue as a result of the project.  A discussion of project product downloads from websites, and publications in technical journals.  A comparison of project expectations and performance. Discuss whether the goals and objectives of the Agreement have been met and what improvements are needed, if any.

  • Study Population Infants who underwent creation of an enterostomy receiving postoperative care and awaiting enterostomy closure: to be assessed for eligibility: n = 201 to be assigned to the study: n = 106 to be analysed: n = 106 Duration of intervention per patient of the intervention group: minimum 21 days/3 weeksuntil patient’s weight >2000g, averaged 6 weeks between enterostomy creation and enterostomy closure Follow-up per patient: 3 months, 6 months and 12 months following enterostomy closure (12- month follow-up only applicable for patients that are recruited early enough to complete this follow-up within the 48 months of overall study duration).

  • Study Area The study area focused on the Bulk Power System in South-Eastern New York between Albany and New York City, and voltages underlying systems at 115 kV and above in the lower Xxxxxx Valley (Zones G, H & I). In the PSS™E power flow base case provided by NYISO, facilities rated at 115 kV and above in PSS™E designated areas 6 through 11 are monitored in the study. These areas are: • Capital District • Xxxxxx • Millwood • Xxxxxxxxx • Con Ed • Long Island

  • Contract Database Metadata Elements Title: Great Neck Union Free School District and Great Neck Paraprofessionals Association (2011) Employer Name: Great Neck Union Free School District Union: Great Neck Paraprofessionals Association Local: Effective Date: 07/01/2011 Expiration Date: 06/30/2015 PERB ID Number: 5132 Unit Size: Number of Pages: 28 For additional research information and assistance, please visit the Research page of the Catherwood website - xxxx://xxx.xxx.xxxxxxx.xxx/library/research/ For additional information on the ILR School - xxxx://xxx.xxx.xxxxxxx.xxx/ AGREEMENT between the Board of Education Great Neck Union Free School District and the Great Neck Paraprofessionals Association (July 1, 2011 - June 30, 2015) TABLE OF CONTENTS ARTICLE# TITLE PAGE# Preamble 2 Article 1 Association Rights 2 Article 2 Board-Administration-Association Relationship and Procedures 4 Article 3 Exchange of Proposals 6 Article 4 Professionals Duties and Responsibilities of Paraprofessionals 7 Article 5 Work Assignments 8 Article 6 Annual Appointment 10 Article 7 Selection and Promotion 10 Article 8 Evaluations and Standards 11 Article 9 Procedures for Termination of Employment 11 Article 10 Conferences 12 Article 11 Human Resource File 12 Article 12 Professional Growth 13 Article 13 Sick Leave 14 Article 14 Personal Leave 16 Article 15 Other Leaves 17 Article 16 Grievance Procedures 18 Article 17 Legal Assistance 19 Article 18 Conformity to Law 19 Article 19 Health Insurance 20 Article 20 Retirement Plan 20 Article 21 Salary Schedule 21 Article 22 Seniority Policy 23 Article 23 Compensation for Financial Loss 24 Article 24 Duration of Agreement 25 Appendix A Determination of Negotiating Unit 25 Appendix B Payroll Deduction Authorization 26 Appendix C Bus Aides 26 Appendix D Salary Schedules 27

  • Road Surfaces (1) Grade, shape, crown, and/or outslope surface and shoulders.

  • Technical Specifications The Technical Specifications furnished on the CD are intended to establish the standards for quality, performance and technical requirements for all labor, workmanship, material, methods and equipment necessary to complete the Work. When specifications and drawings are provided or referenced by the County, these are to be considered part of the Scope of Work, and to be specifically documented in the Detailed Scope of Work. For convenience, the County supplied specifications, if any, and the Technical Specifications furnished on the CD.

  • ARCHAEOLOGY Lessee shall not destroy, disturb, mar, collect, remove or alter any prehistoric or historic resources of any kind on Weld County lands as provided by law. These resources include, but are not limited to, all artifacts of stone, wood or metal, pictographs, structures, and bones. A discovery of anything of prehistoric or historic nature shall be reported to Lessor or the State of Colorado Archaeologist immediately.

Time is Money Join Law Insider Premium to draft better contracts faster.