Flooring definition

Flooring. The Building Shell floor shall be exposed concrete. Building Shell construction includes flooring within the Common Area. Floor preparation and finishes within the demised space are tenant improvement work. PAINTING: Building Shell construction includes painting within the Common Area and painting of the exterior side of exterior walls. The interior side of exterior walls shall be finished as part of tenant improvement work. WINDOW COVERINGS: Window coverings, if required, are tenant improvement work. PLUMBING: One minimum 4” diameter sanitary sewer waste line shall be installed under floor running the entire length of the Building Shell. Building Shell work also includes one minimum 1!4” insulated overhead copper water line, installed below the roof structure directly above the sanitary sewer, and construction of Common Area toilet facilities. All other plumbing work, including water, waste, and vent piping and furnishing and installation of plumbing fixtures within the demised space, is tenant improvement work. Air piping, gas piping, process piping, and other special piping if required, are part of tenant improvement work. At Landlord’s sole discretion, tenant improvement work shall include furnishing and installation of a private water sub- meter with a remote reader to be located within the building Common Area electrical room. abscicor HEATING, VENTILATION, AND AIR CONDITIONING: Building Shell includes necessary improvements to bring natural gas to a manifold location within two feet of the exterior building wall, with gas piping stubbed into the building and run overhead into the tenant space. Building Shell work includes complete HVAC systems and gas piping for the Common Area only. All other HVAC and gas piping systems are part of tenant improvement work.
Flooring. Anti Skid Ceramic Tiles • WALL : Ceramic Tiles upto Door height • CEILING : POP Finish • DOOR : Flush Door • SANITARY WARE : Sanitary ware of Hindware / Parryware or equivalent brand • CP FITTINGS : Sleek C P Fittings from Jaquar or equivalent make • ELECTRICAL :Concealed Wiring with Modular Switches of reputed make, Provision for light, geyser and exhaust points • OTHERS : Granite basin counter in master bedroom only ⮚ LIFTS : Automatic High Speed elevators of reputed make ⮚ LOBBY : Lobbies with Elegant lift façade ⮚ OUTDOOR FINISH : Partly Claded Stone looks and balance in Paint THE SCHEDULE – E ABOVE REFERRED TO (THE COMMON AREA/COMMON PARTS & FACILITIES) (Common Parts , Portions and Amenities)
Flooring or “Floors” means any French Oak Floors timber flooring purchased by the purchaser;

Examples of Flooring in a sentence

  • Flooring of the banking hall of the premises shall be of Doubled charged vitrified tiles and flooring of Record/Stationary Room shall be of Polished Kota stone.

  • Flooring shall be measured from skirting to skirting and where the wall surface are plastered or provided with Dado, it shall be measured from plaster to plaster or dado to dado.

  • Standard Practice for Preparing Concrete Floors to Receive Resilient Flooring.

  • You should ask the owner whether Magnesite Flooring is present and/or seek advice from a Structural Engineer.

  • MFMA - Maple Flooring Manufacturers Association, Inc.; www.maplefloor.org.


More Definitions of Flooring

Flooring or “Floors” means any Urban Oak timber flooring purchased by the purchaser;
Flooring means Morning Star Strand Bamboo flooring sold by
Flooring or “Floors” means any QUALITY FLOORING’s SPC Hybrid flooring purchased by the purchaser.
Flooring or “Floors” means any QUALITY FLOORING’s laminate flooring purchased by the purchaser.
Flooring. Vitrifiedtilesflooringinbedroom,leavingroomandbalcony,Toiletan d Kitchen–Tiles. Electricals: Concealed ISI copper conductor flexible wire and modularswitches of reputed brand. Internet point in Living room. Geyser, microoven,aquaguardconnectingprovision.Generatorconnectingpowerbac kupprovision. Kitchen: Cooking Platform with Black Stone structure, granite top table,Stainless Steel sink, reputed brand glazed tiling up to 3’-0 inch” heightfromcookingtable. Toilets: Marble floor, Wall tiles up to door height of reputed brand. CPbathfittingofISIstandard,reputedbrand.SanitaryfittingsofISIstandard,re putedbrand,allwhite. Doors: Salwood door frame with flush door shutters finished with X. X.xxxx laminated board, duly polished one side. Wooden paneled polishedmaindoor.PVCdooratToilet/WCWindows:Aluminumsliding/case mentwindowswithsmokeglassshutters. SCHEDULE‘E’-SPECIFICATIONS,AMENITIES,FACILITIES(WHICH AREPARTOF THEPROJECT) Lift:Liftpremiumquality Water supply: 24 hrs. Water supply through overhead tank for sufficientstorage&supply.CommunityHall:FirstFloorCommunityHall. Security: 24 hrs. High security. Rain water harvesting Concrete roads andpathways, LED Street lights. Well electrification, two lifts in the block 2,OneLiftinblock1withpowerbackup.Well-equippedCCTVcamera Entry/Exit:Interna lDriveway Commercial Front PlazaSwimming Pool ZoneKidsPoolZoneWoo denDeck GreenArea Sitting Zone with PergolaRoof Top Sitting ZoneTerracePathway Senior Citizen AreaKids Play AreaPeripheral GreenDrop of AreaCommunity HallLibrary
Flooring. Antiskid Ceramic Flooring (size 12 x 12). • Dado: Designer Ceramic Tiles (Size 8 x 12), up to 7’ ft. • Sanitary fittings & water taps: • Shower 01 • Bucket Tap (C.P) 01 • Hot $ Cold Mixer Xxxx 00 Xxxxxxxxxx Xxxxxx ● Xxxxx Xxxxx 00 • 00X Xxxxxx Xxxxx 01 • Exhaust point 01
Flooring. Flooring for all office areas, paneled workstation areas, Exercise Room, all meeting rooms, Sales/Marketing Demo room and related corridors (except as noted below under "SPECIAL AREAS") shall be 32 oz. carpet of usual commercial cut loop type with manufacturer and style to be approved by Palomar. Flooring in the Break Room, all enclosed R&D areas (except the R&D machine shop), all enclosed Engineering areas, the R&D Clean Room, Optics Assembly Room, TBD Lab, Training, all Test Bays, Depot Repair, Mfg. Mech./Elect. Lab, Documentation, IS Mgr., Tel room and related corridors shall be vinyl tile with the style to be approved by Palomar. Flooring in all remaining areas including the R&D Machine Shop, all caged/chain link fenced areas, loading docks, chassis and sub assembly areas, mechanical/electrical/sprinkler rooms to be painted with a polyurethane paint including walkway paths with the product and colors to be approved by Palomar. Ceramic tile will be on all floors and the wet areas of the core toilets, showers and the janitor's closet. The Reception Area shall require the installation of higher grade flooring (to be approved by Palomar). (Should any higher grade flooring be installed, the premium cost of that flooring over higher grade carpet to be at Palomar expense.) Vinyl cove base shall be installed in all areas.