Design Phase means the period during which the Transporter shall prepare a draft project proposal for publication in accordance with section 4.3;
Construction Phase means that Phase of the Project which shall commence after the Authority provides the Trade Contractor with written Notice to Proceed with the Construction Phase.
Development Phase means the period before a vehicle type is type approved.
Construction Phase Services means the coordination, implementation and execution of the Work required by this Agreement, which are further defined in Article 8.
Phase 1 means the first implementation phase of this section, beginning June 1, 2018 and ending May 31, 2022.
Phase 2 means the second implementation phase of this section, beginning June 1, 2022 and continuing thereafter.
Phase III means Phase I (or Phase I/II), Phase II (or Phase II/III) and Phase III clinical trials, respectively, in each case as prescribed by applicable FDA IND Regulations, or any corresponding foreign statutes, rules or regulations.
Maintenance Term means the period of time for which Customer has purchased Maintenance Services, as evidenced by the Purchase Order delivered by Customer in connection therewith, together with all renewals effected in accordance with Section 4 of this Agreement.
Final Completion Date means the date on which Final Completion occurs.
Stage 1 means the area at Port Xxxxxxx which is the subject of this Agreement and of the ERMP and which is shown bordered in purple as “stage 1” on Department of Land Administration 4 Miscellaneous Plan No. 1743;
Phase or “Phases” in respect of the Project shall mean that the components of the Project are placed in service during more than one year during the Investment Period, and the word “Phase” shall therefore refer to the applicable portion of the Project placed in service in a given year during the Investment Period.
Project Completion Date means the date on which the Completion Certificate is issued;
Design flow means the average annual flow or average daily flow specified in an approved facilities plan or approved plans and specifications, the flow specified in a WPDES permit, or the flow required to meet performance standards.
Mechanical Completion means that (a) all components and systems of the Project have been properly constructed, installed and functionally tested according to EPC Contract requirements in a safe and prudent manner that does not void any equipment or system warranties or violate any permits, approvals or Laws; (b) the Project is ready for testing and commissioning, as applicable; (c) Seller has provided written acceptance to the EPC Contractor of mechanical completion as that term is specifically defined in the EPC Contract.
As-built drawings, as used in this clause, means drawings submitted by the Contractor or subcontractor at any tier to show the construction of a particular structure or work as actually completed under the contract. “As-built drawings” shall be synonymous with “Record
Notice to Proceed (NTP) means the authorization issued by the CO to start performance on this Contract.
Construction Completion Date means the date by which the overall development of the Project is completed in accordance with the provisions of this Agreement and when the Construction Completion Certificate is issued by the Independent Engineer as per Article 14.1.
Pre-Construction Phase Services means the participation, documentation and execution of Contractor’s Pre-Construction Phase deliverables as required by this Agreement and further defined in Article 5.
Final Completion means the date determined and certified by A/E and Owner on which the Work is fully and satisfactorily complete in accordance with the Contract.
Final Payment is a payment (in addition to and not a substitution for the regular monthly payments of principal plus accrued interest) due on the earliest to occur of (a) the Maturity Date, or (b) the acceleration of any Term Loan, or (c) the prepayment of a Term Loan pursuant to Section 2.2(c) or (d), equal to the original principal amount of such Term Loan multiplied by the Final Payment Percentage, payable to Lenders in accordance with their respective Pro Rata Shares.
Final plat means the recordable map or other graphical representation of land that complies with Utah Code Xxx. § 10-9a-603 (July, 2021), or any successor provision, and the City’s Vested Laws, and is approved by the City, effectuating a Subdivision of any portion of the Project.
Study Completion means the database for the Study has been locked and all Essential Documents have been provided to the Sponsor, including a copy of the letter from the Reviewing HREC acknowledging receipt of the final report and/or closure letter from the Principal Investigator.
The Contract Price/Project Cost means the price payable to the Vendor under the Contract for the full and proper performance of its contractual obligations.
The Completion Date means the date of completion of the Works as certified by the Employer’s Representative.
Project Year means the 12 month period beginning from the Effective Date and ending 12 months thereafter and each successive 12 month period following thereafter;
Completion Date means the date of completion of the Services by the Service Provider as certified by the Procuring Entity