Final permit definition

Final permit means the version of a permit issued by the Department that has completed all review procedures required by Chapter 14, and for a Class I permit, Chapter 13.
Final permit means the version of an Oregon or LRAPA Title V Operating Permit issued by DEQ or LRAPA that has completed all review procedures required by OAR 340-218-0120 through 340-218-0240.
Final permit means the version of a permit that the Director issues that has completed all review procedures required pursuant to this Section if the permittee does not file a petition pursuant to Article 3 of G.S. 150B that is related to the permit.

Examples of Final permit in a sentence

  • Any change which substantially modifies the Project Facilities as specified in the Ohio EPA approved Facilities Plan and Final Permit to Install or Final Plan Approval (when applicable) or alters the direct or indirect impact of the Project Facilities upon the environment must be incorporated into a Change Order.

  • Upon issuance by the City of a permanent certificate of occupancy (or its substantial equivalent) for the Project, with all construction work on the Project fully completed in accordance with all Final Permit requirements and conditions and the terms of this Agreement, including all final punch list items, Tenant shall be deemed to have achieved final completion of the Project (“Final Completion”).

  • Final Design Deliverables: • Project Coordination and Communications • Draft and Final Permit and Bid Documents including drawings, specifications, and technical reports.

  • ACHD shall calculate the ACHD Impact Fee based upon the ordinance in effect at the time the City issues the Final Permit.

  • Upon the issuance of the first building permit necessary to commence the final construction of the Project (the complete shell and core permit or the "Final Permit"), the City and Developer shall notify ACHD and the ACHD Impact Fee shall be calculated as of the date of the issuance of the Final Permit.


More Definitions of Final permit

Final permit means the version of a Title V permit issued by the director for which all review procedures required by rule 3745-77-08 of the Administrative Code have been completed, or a Title V permit issued by the administrator pursuant to 40 CFR 70.8(C)(4).
Final permit means the version of a part 70 permit issued by the Department that has completed all review procedures required by these regulations.
Final permit means the version of an operating permit under this section issued by the Division that has completed all review procedures required by Chapter 6, Section 3(d) and Section 3(e).
Final permit means the version of a Part C Subpart 2 permit issued by the Department that has completed all review procedures required by §§2102.05, 2103.11, 2103.13, 2103.14, 2103.15, 2103.21, 2103.23, 2103.24, and 2103.25 of this Article.
Final permit means the version of a permit that the Director issues that has completed all review procedures required under this Section if the permittee does not file a petition under Article 3 of G.S. 150B.
Final permit means the version of a permit issued by the Department after completion of all review required by this Chapter.
Final permit means a permit for the use of water granted in terms section thirty-four; “ground water” means all water which is—