new Contract Year shall commence once again from the Scheduled Commissioning Date and end on the immediately succeeding March 31, and thereafter each period of twelve (12) months commencing on April 1 and ending on March 31, andii) provided further that the last Contract Year of this Agreementshall end on the last day of the Term of the PPA.; CTU or Central Transmission Utility Shall mean the Central Transmission Utility as defined in Sub- Section (10) of section (2) of the Electricity Act, 2003 as amendedfrom time to time STU shall mean State Transmission Utility as per Electricity Act, 2003 Delivery Point shall mean the point(s) of connection(s) at which energy is delivered into the Grid Systemi) For intra - state projects, at the voltage level of 33 kV or above of STU/MSETCL sub-station. .ii) For inter - state projects, energy settlement and delivery point shall be at Maharashtra STU/MSETCL periphery. Delivered Energy means the kilowatt hours of Electricity actually fed and measur

AutoNDA by SimpleDocs
Time is Money Join Law Insider Premium to draft better contracts faster.