Total Project Cost Estimate Sample Clauses

Total Project Cost Estimate. Line r – Total Cost Estimate of the Project. Total of lines e + j + q. *Please remember, if the federal aid participation rate entered is not the maximum rate allowed by FHWA, then the participation rate entered becomes the maximum rate allowed.
AutoNDA by SimpleDocs
Total Project Cost Estimate. The Lenders Independent Engineer will review the following: * The EPC and various other equipment suppliersscope of supply and corresponding cost estimate methodology. * The EPC / civil works contracts and corresponding cost estimate methodology. * Assessment of the EPC and other equipment packages finalized for optimization of performance and costs * The taxes, levies, freight and inflation indexation applicable to the EPC and other equipment suppliers’ costs * Identify major equipment not covered in the EPC and other equipment packages finalized and cost impact, if any. * Assess the methodology used to develop the total Project cost estimate. * Compare the total Project cost estimate to that of similar projects. 231 * Evaluate to what extent cost items are based on estimates versus an actual fixed price and identify those items that are not fixed price along with the possible risk associated with these variables. * Opine on the adequacy of the contingency and total project cost estimate.
Total Project Cost Estimate. The following shall be accomplished by the (Construction Manager with assistance from the) Professional.
Total Project Cost Estimate. The parties hereby acknowledge and agree that Base Rent is intended to be determined based on a 7.9% return on Landlord’s costs and expenses to acquire, design, develop and construct the Building shell and core and related areas of the Premises for Tenant’s Permitted Use. In connection therewith, prior hereto, Landlord provided to Tenant, and Txxxxx approved, that certain itemized estimate of the Allowable Costs, which estimate is attached hereto as Schedule 3 (the “Cost Estimate”). The Cost Estimate is subject to adjustment for costs attributable to approved Change Orders and Tenant Delays as well as to update the Cost Estimate based on the Construction Contracts, to the extent applicable.

Related to Total Project Cost Estimate

  • Construction Budget The total amount indicated by the District for the Project plus all other costs, including design, construction, administration, financing, and all other costs.