TECHNICAL TASKS Sample Clauses

TECHNICAL TASKS. Products that require a draft version are indicated by marking “(draft and final)” after the product name in the “Products” section of the task/subtask. If “(draft and final)” does not appear after the product name, only a final version of the product is required. Subtask 1.1 (Products) describes the procedure for submitting products to the CAM.
AutoNDA by SimpleDocs
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure
TECHNICAL TASKS. Deliverables that require a draft version are indicated by marking “(draft and final)” after the deliverable name in the “Deliverables” section of the task/subtask. If “(draft and final)” does not appear after the deliverable name, only a final version of the deliverable is required. Subtask
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): The solar system will be installed on the east side of the equipment yard on the south side of parcel 414-011-012-000. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to serve (For example: greenhouse; irrigation pumps; electric vehicle charging): Irrigation pumps and electric vehicle charging station. Rated Capacity of system: [170.4] kW General Description of Equipment (please include information such as number of arrays or turbines): Six ground-mounted solar arrays configured 2 panels high in portrait will support 480 solar panels and 3 inverters. The solar system’s footprint is approximately 145’ x 135’. Expected Make and Model of Equipment to be Installed (include modules and inverter): Seraphim, SRP-355-6MA-HV (355W) modules; Solectria PVI 50TL inverter Expected Contractor(s), if known (include CSLB license number): Xxxxxxxx’x Energy, Inc. CSLB # 999665 b. Electric Vehicle Charger Description of where equipment will be installed on the property and the renewable energy source serving the charger (For example: located with solar system installed at northeast corner by greenhouse): The charging station will be installed in the employee parking lot on the north side of the solar array. The charging station will be served by the 170.4 KW DC solar system. Charger will be used to serve (For example small car, off-road vehicles forklift, etc.): Employee owned small cars. Is/are the vehicle(s) referenced above used for the agricultural operation specified in the application? Yes No Charging Equipment Specifications (for example make, model, size, ports): PowerCharge Pro Series, Level 2, 3.3 KW, 16 Amp, Dual Port Wall-mount (P10DW) Expected Contractor(s...
TECHNICAL TASKS. Phase Task Description Start Duration Month (Months) I Development of molecular biology protocols. 1 Nucleic acid probe design. Optimal E. coli and lambda 1 1 nucleic acid sequences will be determined for maximum specificity. 2 Optimization of protocols for labeled nucleotide 2 6 incorporation by polymerize target extension. Labeled oligonucleotides complementary to nucleic acid targets will be synthesized by enzymatic extension reactions. Optimal conditions for fluorescent report synthesis will be determined. 3 Optimization of sample preparation protocols. 8 3 Experiments will be performed to determine the optimal conditions for sample preparation. Various parameters such as buffer composition, extraction procedures, and hybridization conditions will be evaluated. Targets will consist of low levels of E. coli genomic DNA. Effects of interferants usually present in food samples will be evaluated. 4 Demonstration of the detection of specific sequences of 11 2 bacterial contaminants. The detection system currently in operation at LANL will be modified to perform experiments on the detection of specific sequences of bacterial contaminants. Increasingly diluted samples of E. coli genomic DNA will be analyzed. Limits of detection are expected to lie in the femtomolar (10-15 M) range. II Design and construction of a prototype instrument for the 13 detection of low levels of E. coli. 1
TECHNICAL TASKS. 4.1 Air Force Activity will be responsible for the following tasks: - Provide suitable demonstration items for the length of the demonstration - Provide technical data/support for the purpose of developing the necessary database for the demonstration. - Review and acceptance of the design of the system for the length of the demonstration - Procure/make available necessary explosives for the demonstration - Provide personnel and support activities necessary for the length of the demonstration - Agree to and coordinate demonstration execution criteria - Execute the agreed demonstration plans - Prepare an after initiative report
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): Northeast corner of APN 000-000-00 For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to power (For example: greenhouse; irrigation pumps; electric vehicle charging): 2 Agricultural electric irrigation pumps Rated Capacity of system: [_173.28_] kW General Description of Equipment (please include information such as number of arrays or turbines): 456 x Canadian Solar (Model CS3U-380MS) PV Panels Expected Make and Model of Equipment to be Installed (include modules and inverter): 1 x Yaskawa Solectria Renewables Model: PVI-28TL-480 & 2 x Solectria Model: XGI 1000-60 (480) Expected Contractor(s), if known (include Contractor State License Board (CSLB) license number): Barrier Solar Inc. CSLB #989005 0000 X. Xxxxxx Ave. Fresno, CA 93722
AutoNDA by SimpleDocs
TECHNICAL TASKS. The purpose of this task is successful procurement and installation of all project components identified in this Agreement. Required technology (select one): Solar photovoltaic (PV) Wind turbine Optional additional equipment (select all that apply): Battery Energy Storage Pump replacement (conversion of fossil fuel pump to electric pump) Electric Vehicle Charging Infrastructure System 1 Project Detail a. Renewable Energy System Description of where equipment will be installed on the property (For example: northeast corner by barn): The array will be located on the ground in the storage area between the shop and house at 00000 Xxx 0, Xxxxxx, XX 00000. For Solar PV, please identify the surface of installation: Rooftop If so, is the rooftop on an existing building? Yes No Parking lot (can be unpaved). If so, is it an existing parking lot? Yes No Ground-mounted or Floating (Solar Panels mounted on pontoons and floating on irrigation pond). Other: Electricity produced will be used to power (For example: greenhouse; irrigation pumps; electric vehicle charging): 4 pumps which irrigate the 300 acres of property, 1 shop, and 2 homes Rated Capacity of system: [_244.11_] kW General Description of Equipment (please include information such as number of arrays or turbines): 6 rows of modules stacked 2 high Expected Make and Model of Equipment to be Installed (include modules and inverter): Modules: (618) Sunpower SPR-395-com Inverters: (3) Delta Products Corp M36U-120 Expected Contractor(s), if known (include Contractor State License Board (CSLB) license number): Trinity Construction Enterprises Inc. DBA Trinity Power: CSLB# 853740
TECHNICAL TASKS. Unless otherwise provided in the individual Task, the Contractor shall prepare all deliverables in accordance with the requirements in Task 1.1-1.8.
TECHNICAL TASKS. TASK 2 INFRASTRUCTURE DESIGN AND INSTALLATION The goals of this task are to enable the project team to engineer, design, and install needed charging stations and related electrical equipment. The Recipient shall: • Develop a Site Design Packet and Engineering Report with the following potential elements: o General Site Plan and electrical sheets o Single Line Diagrams and Load Schedules o Electrical Site Plan o Civil Site Plan o Demolition plan, as applicable should relocation or removal of existing components be required o Structural detail sheetsProvide a draft and final copy of the Site Design Packet and Engineering Report to the CAM. • Submit to the CAM an AB 841 Certification that certifies the project has complied with all AB 841 (2020) requirements specified in Exhibit C or describes why the AB 841 requirements do not apply to the project. The certification shall be signed by Recipient’s authorized representative. • Submit to the CAM EVITP Certification Numbers of each EV Infrastructure Training Program certified electrician that installed EV charging infrastructure or equipment. EVITP Certification Numbers are not required to be submitted if AB 841 requirements do not apply to the project. • Deploy a minimum of 20 DC fast chargers at relevant TRUSD sites. • Evaluate existing switchgear capacity and if needed perform installation of new Amp panel, main breaker and switchgear to serve 20 DC fast chargers. • Perform installation of all above ground and trenched conduit, conductors, circuit breakers, grounding, and network communications, consistent with manufacturer requirements, all applicable codes and standards, and reasonable future proofing considerations. • Install concrete footings as needed per charger installation configuration. • As applicable, install concrete removable bollards to protect against bus collision with chargers. • Develop an Infrastructure Installation Report that includes high-resolution photographs of final installations and that summarizes infrastructure deployments by site, capacity, public or private access level and final operational status. • Provide a draft and final copy of the Infrastructure Installation Report to the CAM. Products: • Site Design Packet and Engineering Report (Draft and Final) • AB 841 Certification and EVITP Certification Numbers • Installation Report (Draft and Final)
Time is Money Join Law Insider Premium to draft better contracts faster.