Interconnection 2.1.10 Startup Testing and Commissioning
Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.
Delivery Point (a) All Energy shall be Delivered hereunder by Seller to Buyer at the Delivery Point. Seller shall be responsible for the costs of delivering its Energy to the Delivery Point consistent with all standards and requirements set forth by the FERC, ISO-NE, the Interconnecting Utility and any other applicable Governmental Entity and any applicable tariff.
Information Systems Acquisition Development and Maintenance ● Product features are managed through a formalized product management process. Security requirements are discussed and formulated during scoping and design discussions. ● XxxXxxx maintains a QA Department dedicated to reviewing and testing application functionality and stability. ● Application source code is stored in a central repository. Access to source code is limited to authorized individuals. ● Changes to MaxMind software are tested before production deployment. Deployment processes include unit testing at the source environment, as well as integration and functional testing within a test environment prior to implementation in production.