Reactive Energy Billing. The Solar Power Developer shall pay at the rate of 40 paisa or any other rate fixed by the Commission, for each kVARh drawn.
Reactive Energy Billing. The Developer shall pay at the rate of 40 paisa or any other rate fixed by the Commission, for each kVARH drawn.
Reactive Energy Billing. The Reactive power charges and charges against power drawn from grid as per CERC/SERC regulations, shall be payable by Developer.
Reactive Energy Billing. The SPG shall pay at the rate of [40] paisa or any other rate fixed by the Commission, for each kVARH drawn.
Reactive Energy Billing. The Developer shall pay at the rate of 40 paisa or any other rate fixed by the Commission, for each kVARH drawn.34 32 As per Addendum-6 dated 29 Dec 2017 33 As per Addendum-2 dated 19 Dec 2017 34 As per Addendum-2 dated 19 Dec 2017 ARTICLE 13: BILLING AND PAYMENT