Plant Load Factor (PLF) Sample Clauses

Plant Load Factor (PLF). On this the petitioner prayed that the threshold limit of 55% PLF for payment of fixed cost should not be applied to units generated and exported using coal during non-crushing season. All units generated and supplied to the grid by using coal as fuel shall be paid for both fixed and variable costs. In response to this issue, the respondents averred that t h e Commission determined threshold PLF limit as 55% for the Bagasse based co-generation projects, by which time these projects would recover their fixed cost. As such, the fixed cost may not be payable beyond the threshold PLF limit of 55% even with usage of coal. Further, the Commission in orders dated 27-07-2010 in O.P.No.37/2009 between M/s. Vemagiri and DISCOMs allowed difference in additional variable cost incurred by generating company due to GoAP Section 11 directions and stated that fixed cost shall be paid as per PPA only. Now the point for the consideration of the Commission is whether fixed charges are to be paid upto 55% PLF only or for the entire units exported. While addressing this issue, it is to be borne in mind that the fixed costs are paid for the assets gainfully employed in the relevant business. Further, as per Commission’s Orders, the co-gen developer will be able to recover his full fixed cost at a performance level of 55% PLF itself. The type of fuel used (coal in this case) and the period of generation (non-crushing season) have no bearing on the fixed cost recovery as long as the short-fall in PLF on account of shortage of bagasse is allowed to be compensated duly taking into account, the generation with coal and during the non-crushing season. Hence, the Commission is of the view that fixed cost may be paid upto 55% PLF (the generation using coal during non-crushing season shall also be taken into account for computing the PLF) and thereafter, only incentive needs to be paid. The variable costs are any way payable for all the units supplied to DISCOMs. It is to be kept in mind that paying fixed charges for the entire units exported, amounts to paying more than the fixed charges, corresponding to the assets gainfully employed and hence, this request of the petitioner can not be accepted.
AutoNDA by SimpleDocs
Plant Load Factor (PLF). The Plant Load Factor in a Tariff Year expressed in percentage is: Total net Electrical Energy measured at Interconnection Point x 100 PLF = (Installed Capacity of Thermal Power Station in MW)*(8760)*(100-A) Whereas A is the auxiliary consumption expressed in percentage of the thermal Power station.

Related to Plant Load Factor (PLF)

  • Number Resources, Rate Center Areas and Routing Points 13.1 Nothing in this Agreement shall be construed to limit or otherwise adversely affect in any manner either Party’s right to employ or to request and be assigned any Central Office Codes (“NXX”) pursuant to the Central Office Code Assignment Guidelines and any relevant FCC or Commission orders, as may be amended from time to time, or to establish, by Tariff or otherwise, Rate Center Areas and Routing Points corresponding to such NXX codes.

  • Mileage Measurement Where required, the mileage measurement for LIS rate elements is determined in the same manner as the mileage measurement for V&H methodology as outlined in NECA Tariff No. 4.

  • Power Factor Requirement Consistent with Section 4.7 of Appendix 2 to this ISA, the power factor requirement is as follows: The Generation Interconnection Customer shall design its non-synchronous Customer Facility with the ability to maintain a power factor of at least 0.95 leading to 0.95 lagging measured at the high-side of the facility substation transformers.

  • Earned Value Management System ‌ An earned value management system (EVMS) means a project management tool that effectively integrates the project scope of work with cost, schedule and performance elements for optimum project planning and control. The qualities and operating characteristics of EVMS are described in American National Standards Institute /Electronics Industries Alliance (ANSI/EIA) Standard-748. An EVMS is not mandatory; however, Contractors are encouraged to have an EVMS ANSI/EIA Standard-748 during the entire term of OASIS. The Contractor shall notify the OASIS CO, in writing, if there are any changes in the status of their EVMS and provide the reasons for the change and copies of audits by the Defense Contract Management Agency (DCMA) or other cognizant Government administration office, as applicable. If only part of a Contractor’s organization is EVMS ANSI/EIA Standard-748 certified, the Contractor shall make the distinction between which business units or sites and geographic locations have been certified.

  • Wage Adjustment Notwithstanding any provision in this Agreement on the contrary, the wages of employees shall be reduced by the amount of employee contributions made by the employer pursuant to the provisions hereof.

  • Casual Loading (e) Superannuation contributions are to be made for periods when Employees are on:

  • Power Factor The Power Producer shall maintain the Power Factor as per the prevailing GERC regulations and as may be stipulated / specified by GETCO from time to time. The Power Producer shall provide suitable protection devices, so that the Electric Generators could be isolated automatically when grid supply fails. Connectivity criteria like short circuit level (for switchgear), neutral Grounding, fault clearance time, current unbalance (including negative and zero sequence currents), limit of harmonics etc. shall be as per Grid Code.

  • Required Coverages For Generation Resources Of 20 Megawatts Or Less Each Constructing Entity shall maintain the types of insurance as described in section 11.1 paragraphs (a) through (e) above in an amount sufficient to insure against all reasonably foreseeable direct liabilities given the size and nature of the generating equipment being interconnected, the interconnection itself, and the characteristics of the system to which the interconnection is made. Additional insurance may be required by the Interconnection Customer, as a function of owning and operating a Generating Facility. All insurance shall be procured from insurance companies rated “A-,” VII or better by AM Best and authorized to do business in a state or states in which the Interconnection Facilities are located. Failure to maintain required insurance shall be a Breach of the Interconnection Construction Service Agreement.

  • Second Year Wage Adjustment Effective July 1, 2020, all salary ranges and rates shall be increased by two and one-half percent (2.50%), rounded to the nearest cent. Salary increases provided by this Section shall be given to all employees including those employees whose rates of pay exceed the maximum rate for their class. The compensation grids for classes covered by this Agreement are contained in Appendix E-2. Conversion to the new compensation grid shall not change an employee’s eligibility for step progression increases.

  • Switching System Hierarchy and Trunking Requirements For purposes of routing ECI traffic to Verizon, the subtending arrangements between Verizon Tandem Switches and Verizon End Office Switches shall be the same as the Tandem/End Office subtending arrangements Verizon maintains for the routing of its own or other carriers’ traffic (i.e., traffic will be routed to the appropriate Verizon Tandem subtended by the terminating End Office serving the Verizon Customer). For purposes of routing Verizon traffic to ECI, the subtending arrangements between ECI Tandem Switches and ECI End Office Switches shall be the same as the Tandem/End Office subtending arrangements that ECI maintains for the routing of its own or other carriers’ traffic.