Phase 4 Project Report Sample Clauses

Phase 4 Project Report. Details the project progress for phase 4 of the project which runs between months 19 and 24
AutoNDA by SimpleDocs

Related to Phase 4 Project Report

  • Final Project Report Prepare a Final Project Report that addresses, to the extent feasible, comments made by the Grant Manager on the Draft Final Project Report. Submit one (1) reproducible master and an electronic copy of the final. Upload an electronic copy of the final report in pdf format to the FAAST system.

  • Project Reports 1. The Borrower shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 5.08 of the General Conditions and on the basis of the indicators agreed with the Bank. Each Project Report shall cover the period of one calendar semester, and shall be furnished to the Bank not later than one month after the end of the period covered by such report.

  • Project Reports; Completion Report 1. The Recipient shall monitor and evaluate the progress of the Project and prepare Project Reports in accordance with the provisions of Section 2.06 of the Standard Conditions and on the basis of indicators agreed with the World Bank. Each Project Report shall cover the period of one (1) calendar semester, and shall be furnished to the World Bank not later than one (1) month after the end of the period covered by such report.

  • Project Completion Report At the completion of construction and once a Project is placed in service, the Subrecipient must submit a Project Completion Report that includes the total number of units built and leased, affordable units built and leased, DR-MHP units built and leased, an accomplishment narrative, and the tenants names, demographics and income for each DR-MHP unit.

  • Progress Report 10.1 If required, you shall submit progress reports in connection with the Service (“Report”) on at least a monthly basis, or as we may require. The Report shall include a summary of the activities and accomplishments during the previous reporting period.

  • Project Reporting During the course of Implementation Services, the NAVITAIRE Hosted Revenue Accounting Services Project Manager will coordinate status reporting with the NAVITAIRE Hosted Reservation Services Project Manager. Following completion of installation of the Hosted Reservation Services, the NAVITAIRE Hosted Revenue Accounting Services Project Manager will provide Customer with status on the remaining Implementation Services for Hosted Revenue Accounting Services as follows; (a) Weekly Project Plan Update and Status Report; (b) Weekly Updated Issues/Resolution List; and (c) Executive Summary.

  • Progress Reports The Recipient shall submit to the OPWC, at the OPWC's request, summary reports detailing the progress of the Project pursuant to this Agreement and any additional reports containing such information as the OPWC may reasonably require.

  • Project Review A. Programmatic Allowances

  • Monthly Progress Report This report shall include a description of the activities during the reporting period and the activities planned for the ensuing reporting period. The first reporting period consists of the first full month of performance plus any fractional part of the initial month. Thereafter, the reporting period shall consist of each calendar month. The Contractor shall submit a Monthly Progress Report on or before the 15th calendar day following the last day of each reporting period and shall include the following: Title Page: The title page for this report shall include the contract number and title; the type of report and period that it covers; the Contractor’s name, address, telephone number, fax number, and e-mail address; and the date of submission.

  • ASSESSMENT REPORT Within 120 days following the general election held on November 2nd 2003, the returning officer of the munici- pality shall forward, in accordance with section 659.3 of the Act respecting elections and referendums in munici- palities (R.S.Q., c. E-2.2), an assessment report to the Chief Electoral Officer and the Minister setting out relevant ways to improve the trial and addressing, in particular, the following points : — the preparations for the election (choice of the new method of voting, communications plan, etc.) ; — the conduct of the advance poll and the poll ; — the cost of using the electronic voting system : – the cost of adapting election procedures ; – non-recurrent costs likely to be amortized ; – a comparison between the actual polling costs and the estimated polling costs using the new methods of voting and the projected cost of holding the general election on November 2nd 2003 using traditional methods ; — the number and duration of incidents during which voting was stopped, if any ; — the advantages and disadvantages of using the new method of voting ; — the results obtained during the addition of the votes and the correspondence between the number of ballot paper cards issued to the deputy returning officers and the number of ballot paper cards returned used and unused ; — the examination of rejected ballot papers, if it has been completed.

Time is Money Join Law Insider Premium to draft better contracts faster.