MANAGEMENT PLAN FOR THE PROJECT Sample Clauses

MANAGEMENT PLAN FOR THE PROJECT. Proposers shall provide a comprehensive narrative statement that sets out the management plan they intend to follow and illustrates how their plan will serve to accomplish the work and meet the County’s project schedule.
AutoNDA by SimpleDocs

Related to MANAGEMENT PLAN FOR THE PROJECT

  • Construction Management Plan Contractor shall prepare and furnish to the Owner a thorough and complete plan for the management of the Project from issuance of the Proceed Order through the issuance of the Design Professional's Certificate of Material Completion. Such plan shall include, without limitation, an estimate of the manpower requirements for each trade and the anticipated availability of such manpower, a schedule prepared using the critical path method that will amplify and support the schedule required in Article 2.1.5 below, and the Submittal Schedule as required in Article 2.2.3. The Contractor shall include in his plan the names and resumés of the Project Superintendent, Project Manager and the person in charge of Safety.

  • Management Plan The Management Plan is the description and definition of the phasing, sequencing and timing of the major Individual Project activities for design, construction procurement, construction and occupancy as described in the IPPA.

  • Development of the Project 4.1 TSP's obligations in development of the Project: Subject to the terms and conditions of this Agreement, the TSP at its own cost and expense shall observe, comply with, perform, undertake and be responsible:

  • Project Management Plan 1 3.4.1 Developer is responsible for all quality assurance and quality control 2 activities necessary to manage the Work, including the Utility Adjustment Work.

  • MANAGEMENT OF EVALUATION OUTCOMES 11.1 The evaluation of the Employee’s performance will form the basis for rewarding outstanding performance or correcting unacceptable performance.

  • Construction Management Fee The Construction Management Fee for the Project shall be either a ☒Lump Sum or ☐Not-To-Exceed Fee of Sixty-Six Thousand, Six Hundred Eleven Dollars and Seventy-Five Cents ($66,611.75). NOTE: Allowances will be on a Not-To-Exceed basis. All unused funds will be returned to the School District at the time of construction closeout. Fee will be paid only on cost of work for these items.

  • Construction Management Landlord or its Affiliate or agent shall supervise the Work, make disbursements required to be made to the contractor, and act as a liaison between the contractor and Tenant and coordinate the relationship between the Work, the Building and the Building’s Systems. In consideration for Landlord’s construction supervision services, Tenant shall pay to Landlord a construction supervision fee equal to three percent (3%) of Tenant’s Costs specified in Section 7.

  • CARE AND MAINTENANCE OF RESIDENCE FACILITIES The Student is responsible for the care of rooms, furnishings and equipment in the residence facilities, and for keeping the Student’s residence and shared common areas clean and sanitary, including, but not limited to, taking reasonable steps to control pests and insects. Furniture or fixtures are assigned to residence facilities and common areas on a room or area basis by UCF DHRL, and may not be moved or transferred from the assigned room or area without prior written or electronically reproducible permission from UCF DHRL. Changes or modifications to residence accommodations are prohibited, unless specifically authorized by a prior written or electronically reproducible approval from UCF DHRL.

  • Access Toll Connecting Trunk Group Architecture 9.2.1 If CBB chooses to subtend a Verizon access Tandem, CBB’s NPA/NXX must be assigned by CBB to subtend the same Verizon access Tandem that a Verizon NPA/NXX serving the same Rate Center Area subtends as identified in the LERG.

Time is Money Join Law Insider Premium to draft better contracts faster.