Infrastructure Capacity. Subject to Developer’s installation of infrastructure in accordance with the requirements of the Project Approvals, City hereby acknowledges that it will utilize its best efforts to reserve sufficient capacity in its infrastructure, services and utility systems, including, without limitation, traffic circulation, storm drainage, flood control, electric service, sewer collection, sewer treatment, sanitation service and, except for reasons beyond City’s control, and that City will utilize its best efforts to reserve water supply, treatment, distribution and service, as and when necessary to serve the Project as it is developed. To the extent that City renders such services or provides such utilities, City hereby agrees that it will serve the Project and that there shall be no restriction on hookups or service for the Project except for reasons beyond City’s control.
AutoNDA by SimpleDocs
Infrastructure Capacity. Subject to Developer’s installation of infrastructure in accordance with the requirements of the Project Approvals, City hereby acknowledges and agrees that, to the extent that City renders such services or provides such utilities, it will provide, and shall reserve, sufficient capacity in its infrastructure, services and utility systems, including, without limitation, traffic circulation, storm drainage, flood control, electric service, sewer collection, sewer treatment, sanitation service and water treatment and distribution, as and when necessary to serve the Project as it is developed. To the extent that City renders such services or provides such utilities, City hereby agrees that it will serve the Project and that there shall be no restriction on hookups or service for the Project except for reasons beyond City’s control. City further acknowledges and agrees that is will secure and designate the necessary allocations from all entities, including but not limited to MCWD, to ensure sufficient water supply to serve the Project.
Infrastructure Capacity. Subject to Developer’s installation of infrastructure in accordance with the requirements of the Project Approvals and payment of the appropriate development impact fees, City hereby acknowledges that it will have, and shall reserve, sufficient capacity in its infrastructure, services and utility systems, including, without limitation, traffic circulation, storm drainage, flood control, sewer collection, sewer treatment, sanitation service and, except for reasons beyond City’s control, water supply, treatment, distribution and service, as and when necessary to serve the Project as it is developed. To the extent that City renders such services or provides such utilities, City hereby agrees that it will serve the Project and that there shall be no restriction on hookups or service for the Project except for reasons beyond City’s reasonable control. Notwithstanding anything to the contrary in this Section 2.I(2), Developer shall install new sanitary sewer collection systems to create any required additional capacity to serve the Project if the DIF 54 project and the junction structure are not constructed prior to first Project occupancy.
Infrastructure Capacity. Subject to Developer’s installation of infrastructure in accordance with the requirements of the Project Approvals, City shall undertake all reasonable efforts to reserve sufficient capacity in its infrastructure, services and utility systems, including, without limitation, traffic circulation, storm drainage, flood control, electric service, sewer collection, sewer treatment, sanitation service and, except for reasons beyond City’s control, water supply, treatment, distribution and service, as and when necessary to serve the Project as it is developed.
Infrastructure Capacity. 8.1 Subject to conditions of approval requiring specific upgrades, County hereby acknowledges that it has been informed that the Project will have sufficient capacity in its infrastructure, services, and utility systems, including, without limitation, traffic circulation, flood control, water supply, treatment, distribution, and service, to accommodate the Project.

Related to Infrastructure Capacity

  • Contract Capacity The generation capability designated for the Project shall be the contract capacity in MW designated in the Cover Sheet, net of all auxiliary loads, station electrical uses, and Electrical Losses (the “Contract Capacity”). Throughout the Delivery Term, Seller shall sell and deliver all Product produced by the Project solely to Buyer. In no event shall Buyer be obligated to receive, in any Settlement Interval, any Surplus Delivered Energy. Seller shall not receive payment for any Surplus Delivered Energy. To the extent Seller delivers Surplus Delivered Energy to the Delivery Point in a Settlement Interval in which the Real-Time Price for the applicable PNode is negative, Seller shall pay Buyer an amount equal to the Surplus Delivered Energy (in MWh) during such Settlement Interval, multiplied by the absolute value of the Real-Time Price per MWh for such Settlement Interval.]

  • Infrastructure (a) The Borrower has and will maintain a sufficient infrastructure to conduct its business as presently conducted and as contemplated to be conducted following its execution of this Agreement.

  • Interconnection Customer’s Interconnection Facilities The Interconnection Customer shall design, procure, construct, install, own and/or control the Interconnection Customer’s Interconnection Facilities described in Appendix A at its sole expense.

  • Interconnection Customer Provided Services The services provided by Interconnection Customer under this LGIA are set forth in Article 9.6 and Article 13.5.1. Interconnection Customer shall be paid for such services in accordance with Article 11.6.

  • Interconnection Customer (1) Interconnection Customer shall construct and, unless otherwise indicated, shall own, the following Interconnection Facilities: None

  • Interconnection Customer Interconnection Facilities Interconnection Customer shall design, procure, construct, install, own and/or control Interconnection Customer Interconnection Facilities described in Appendix A, Interconnection Facilities, Network Upgrades and Distribution Upgrades, at its sole expense.

  • Energy Resource Interconnection Service (ER Interconnection Service).

  • Interconnection Customer’s Interconnection Facilities Construction The Interconnection Customer’s Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Interconnection Customer shall deliver to the Participating TO and CAISO “as-built” drawings, information and documents for the Interconnection Customer’s Interconnection Facilities and the Electric Generating Unit(s), such as: a one-line diagram, a site plan showing the Large Generating Facility and the Interconnection Customer’s Interconnection Facilities, plan and elevation drawings showing the layout of the Interconnection Customer’s Interconnection Facilities, a relay functional diagram, relaying AC and DC schematic wiring diagrams and relay settings for all facilities associated with the Interconnection Customer's step-up transformers, the facilities connecting the Large Generating Facility to the step-up transformers and the Interconnection Customer’s Interconnection Facilities, and the impedances (determined by factory tests) for the associated step-up transformers and the Electric Generating Units. The Interconnection Customer shall provide the Participating TO and the CAISO specifications for the excitation system, automatic voltage regulator, Large Generating Facility control and protection settings, transformer tap settings, and communications, if applicable. Any deviations from the relay settings, machine specifications, and other specifications originally submitted by the Interconnection Customer shall be assessed by the Participating TO and the CAISO pursuant to the appropriate provisions of this LGIA and the LGIP.

  • Independent Capacity of Contractor The Contractor and Contractor Parties shall act in an independent capacity and not as officers or employees of the state of Connecticut or of the Agency.

  • Network Interconnection 26.1 Interconnection between the networks of different SERVICE PROVIDERs shall be as per National Standards of CCS No.7 issued from time to time by Telecom Engineering Centre (TEC) and also subject to technical feasibility and technical integrity of the Networks and shall be within the overall framework of interconnection regulations issued by the TRAI from time to time. However, if situation so arises, INTERCONNECTION with R2MF signaling may be permitted by LICENSOR.

Time is Money Join Law Insider Premium to draft better contracts faster.