Groundwater Treatment Systems Sample Clauses

Groundwater Treatment Systems. Each system will be monitored, at a minimum, for untreated influent and treated effluent, and for impacts to surface water downstream of the effluent discharge point according to the sampling criteria in Table 2 and the decision rules in the attached flowcharts. The systems will be maintained to ensure the effluent meets Table 1 standards.
AutoNDA by SimpleDocs
Groundwater Treatment Systems. Figure 12.
Groundwater Treatment Systems. Notes: 2 Summary statistics:    PLF influent: 85th percentile PLF performance: individual results ETPTS, MSPTS, and SPPTS: 85th percentile 3 Evaluation periods:  PLF influent: period including a minimum of 16 data points and starting on 12/28/2005  PLF performance: quarterly  ETPTS, MSPTS, and SPPTS: period including a minimum of 8 data points and starting on 1/1/2000 4 Influent locations:  PLF: PLFSEEPINF  ETPTS: ET INFLUENT  MSPTS: R1-0  SPPTS: SPIN 5 Effluent locations:  PLF: PLFSYSEFF  ETPTS: ET EFFLUENT  MSPTS: R2-E  SPPTS: SPOUT 6 Performance locations:  PLF: PLFSYSEFF, NNG01  ETPTS: POM2  MSPTS: GS10  SPPTS: GS13 7 Only for analytes above standards

Related to Groundwater Treatment Systems

  • Groundwater The groundwater shall not be degraded as a result of the waste maintained at the facility.

  • Substance Abuse Treatment Information Substance abuse treatment information shall be maintained in compliance with 42 C.F.R. Part 2 if the Party or subcontractor(s) are Part 2 covered programs, or if substance abuse treatment information is received from a Part 2 covered program by the Party or subcontractor(s).

  • Quality Management System Supplier hereby undertakes, warrants and confirms, and will ensue same for its subcontractors, to remain certified in accordance with ISO 9001 standard or equivalent. At any time during the term of this Agreement, the Supplier shall, if so instructed by ISR, provide evidence of such certifications. In any event, Supplier must notify ISR, in writing, in the event said certification is suspended and/or canceled and/or not continued.

  • TOOL STORAGE 1. A company shall provide on all construction jobs in towns and cities, and elsewhere where reasonably necessary and practicable (or if requested buy the employee), a suitable and secure waterproof lock-up solely for the purpose of storing employees’ tools, and on multi-storey and major projects the company shall provide, where possible, a suitable lock-up for employees’ tools within a reasonable distance of the work area of large groups of employees.

  • Fraud, Waste, and Abuse Contractor understands that HHS does not tolerate any type of fraud, waste, or abuse. Violations of law, agency policies, or standards of ethical conduct will be investigated, and appropriate actions will be taken. Pursuant to Texas Government Code, Section 321.022, if the administrative head of a department or entity that is subject to audit by the state auditor has reasonable cause to believe that money received from the state by the department or entity or by a client or contractor of the department or entity may have been lost, misappropriated, or misused, or that other fraudulent or unlawful conduct has occurred in relation to the operation of the department or entity, the administrative head shall report the reason and basis for the belief to the Texas State Auditor’s Office (SAO). All employees or contractors who have reasonable cause to believe that fraud, waste, or abuse has occurred (including misconduct by any HHS employee, Grantee officer, agent, employee, or subcontractor that would constitute fraud, waste, or abuse) are required to immediately report the questioned activity to the Health and Human Services Commission's Office of Inspector General. Contractor agrees to comply with all applicable laws, rules, regulations, and System Agency policies regarding fraud, waste, and abuse including, but not limited to, HHS Circular C-027. A report to the SAO must be made through one of the following avenues: ● SAO Toll Free Hotline: 1-800-TX-AUDIT ● SAO website: xxxx://xxx.xxxxx.xxxxx.xx.xx/ All reports made to the OIG must be made through one of the following avenues: ● OIG Toll Free Hotline 0-000-000-0000 ● OIG Website: XxxxxxXxxxxXxxxx.xxx ● Internal Affairs Email: XxxxxxxxXxxxxxxXxxxxxxx@xxxx.xxxxx.xx.xx ● OIG Hotline Email: XXXXxxxxXxxxxxx@xxxx.xxxxx.xx.xx. ● OIG Mailing Address: Office of Inspector General Attn: Fraud Hotline MC 1300 P.O. Box 85200 Austin, Texas 78708-5200

Time is Money Join Law Insider Premium to draft better contracts faster.