Exception Sheet Elimination Sample Clauses

Exception Sheet Elimination. The Company will implement the ability to input the current exception sheet information into the scanner and the scanner will then replace the exception sheet. Exception sheets will be eliminated by no later than January 1st, 2018. LETTER OF UNDERSTANDING # 1 BETWEEN XXXXXX EXPRESS (CANADA), LTD. (HEREINAFTER REFERRED TO AS THE "COMPANY") AND UNIFOR (UNIFOR-CANADA) (HEREINAFTER REFERRED TO AS THE "UNION")
AutoNDA by SimpleDocs

Related to Exception Sheet Elimination

  • Timber Cut Through Mistake Undesig- nated timber meeting Utilization Standards, cut by Pur- chaser through mistake and included by Contracting Offi- cer under B2.14, shall be removed and paid for at Current Contract Rates and Required Deposits, unless such ma- terial is not listed in A2. In such event, Contracting Offi- cer, in accord with standard Forest Service methods, shall establish rates to be paid.

  • Completion of Punch List items 14.4.1 All items in the Punch List shall be completed by the Concessionaire within 90 (ninety) days of the date of issue of the Provisional Certificate and for any delay thereafter, other than for reasons solely attributable to the Authority or due to Force Majeure, the Authority shall be entitled to recover Damages from the Concessionaire to be calculated and paid for each day of delay until all items are completed, at the lower of (a) 0.1% (zero point one per cent) of the Performance Security, and (b) 0.2% (zero point two per cent) of the cost of completing such items as estimated by the Independent Engineer. Subject to payment of such Damages, the Concessionaire shall be entitled to a further period not exceeding 120 (one hundred and twenty) days for completion of the Punch List items. For the avoidance of doubt, it is agreed that if completion of any item is delayed for reasons solely attributable to the Authority or due to Force Majeure, the completion date thereof shall be determined by the Independent Engineer in accordance with Good Industry Practice, and such completion date shall be deemed to be the date of issue of the Provisional Certificate for the purposes of Damages, if any, payable for such item under this Clause 14.4.1.

  • HHSC SPECIAL CONDITIONS The terms and conditions of these Special Conditions are incorporated into and made a part of the Contract. Capitalized items used in these Special Conditions and not otherwise defined have the meanings assigned to them in HHSC Uniform Terms and Conditions -Grant- Version 2.16.1

  • Construction Schedule The progress schedule of construction of the Project as provided by Developer and approved by District.

  • Seller’s Conditions The obligations of Seller at the Closing are subject, at the option of Seller, to the satisfaction or waiver at or prior to the Closing of the following conditions precedent:

  • CHANGE IN CLASSIFICATION SPECIFICATIONS Section 1. The Employer shall notify the Union of intended classification studies.

  • SPECIAL CONDITION With respect to Liability to the Fund or its shareholders, and subject to applicable state and federal law, the Board Member shall be indemnified pursuant to this Section 1 against any Liability unless such Liability arises by reason of the Board Member’s willful misfeasance, bad faith, gross negligence, or reckless disregard of the duties involved in the conduct of his or her office as defined in such Section 17(h) of the Investment Company Act of 1940, as amended (“Disabling Conduct”).

  • Punchlist Upon completion of the Performance Tests and prior to Substantial Completion of a Subproject, Owner and Contractor shall inspect the Subproject, and Contractor shall prepare a proposed Punchlist of items identified as needing to be completed or corrected as a result of such inspection. Contractor shall promptly provide the proposed Punchlist to Owner for its review, together with an estimate of the time and cost necessary to complete or correct each Punchlist item. Contractor shall add to the proposed Punchlist any Punchlist items that are identified by Owner within ten (10) Days after Owner’s receipt of the proposed Punchlist from Contractor, and Contractor shall immediately initiate measures to complete or correct, as appropriate, any item on Contractor’s proposed Punchlist (including those items identified by Owner during Owner’s review) that are not of a Punchlist nature. Notwithstanding anything to the contrary in this Agreement, Contractor and Owner are not required as a condition of Substantial Completion of a Subproject to agree upon and identify every Punchlist item and include it on the Punchlist, but Contractor is required to complete as a condition of Substantial Completion of such Subproject that does not meet the definition of Punchlist as provided in Section 1.1. In the event of a dispute regarding whether a specific item of Work meets the definition of Punchlist under Section 1.1, the Parties shall resolve such dispute in accordance with Section 18.1A. Owner shall provide Contractor with access to the Work after Substantial Completion of a Subproject sufficient to enable Contractor to complete all Punchlist items, so long as such access does not unreasonably interfere with operation of a Subproject after Substantial Completion of the Subproject or the Existing Facility and subject to any reasonable security or safety requirements of Owner. Upon Contractor’s completion or correction of any items necessary to achieve Substantial Completion of a Subproject, as modified by any Owner additions, such Punchlist shall govern Contractor’s performance of the Punchlist items up to Final Completion. All Work on the Punchlist shall be completed by the date required for Final Completion, as specified in Section 5.3C, or Owner may, in addition to any other rights that it may have under this Agreement, complete such Punchlist Work at the expense of Contractor. In the event Owner elects to complete such Punchlist Work, Contractor shall pay Owner, within ten (10) Days after receipt of written notice from Owner, all reasonable costs and expenses incurred by Owner in performing such Punchlist Work, or, at Owner’s sole discretion, Owner may withhold or offset amounts owed to Contractor or collect on the Letter of Credit in accordance with Section 7.8 in the amount of such costs and expenses. Any Defective Work identified after agreement between the Parties of the Punchlist shall be corrected by Contractor as a Warranty item under Article 12.

  • Punch List If, at any time after the Project has been Physically Completed, there shall exist any item or items requiring completion or correction, then the Developer agrees to use all reasonable diligence to complete or correct such item or items so that each conforms to the Final Plans. The parties shall make a Punch-List of the items requiring completion or correction (the "Punch List"). Each item on the Punch-List shall be assigned a reasonable value based upon the reasonable cost of completion or correction of the same or such other value as may be required by the Owner's lender ("Punch-List Amount"). The Developer shall give its written undertaking to complete each such item within forty-five (45) days (or such other period of time as is mutually agreed upon by the parties).

  • – OTHER SPECIAL CONDITIONS The following additional special conditions apply to this agreement: