Environmental Permitting Sample Clauses

Environmental Permitting. If requested by the DEPARTMENT, the AGENCY shall sign as a joint applicant and be responsible for the permits related to the Project. Further the AGENCY shall be in compliance with all permits after the construction is complete and the right of way is transferred to the AGENCY. To the extent permitted by law, the AGENCY shall indemnify the DEPARTMENT for any violations by the AGENCY of any permits issued to the Department or jointly to the AGENCY and the DEPARTMENT after construction is complete upon final acceptance by the Department. The AGENCY shall execute all documentation required by the permitting agencies in a timely manner to accept transfer of the Project. For various occupancy permits the AGENCY shall be the applicant.
AutoNDA by SimpleDocs
Environmental Permitting. If requested by the DEPARTMENT, the COUNTY shall sign as a joint applicant and be responsible for the permits related to the Project. Further the COUNTY shall be in compliance with all permits after the construction is complete and the right of way is transferred to the COUNTY. To the extent permitted by law, the COUNTY shall indemnify the DEPARTMENT for any violations by the COUNTY of any permits issued to the DEPARTMENT or jointly to the COUNTY and the DEPARTMENT after construction is complete. The COUNTY shall execute all documentation required by the permitting agencies in a timely manner to accept transfer of the Project. For various occupancy permits the COUNTY shall be the applicant.
Environmental Permitting. The CONSULTANT shall assist the LPA in securing the necessary environmental permits for the project by developing permit-compliant drawings, drafting the permit applications, and coordinating, applying for, and tracking the status of the permits until they are received. The CONSULTANT shall assist the LOCAL PUBLIC AGENCY in securing the environmental permits marked with an “x” in the box below: Indiana Department of Environmental Management (IDEM) Section 401 Individual Permit Indiana Department of Environmental Management (IDEM) Section 401/United States Army Corps of Engineers (USACE) Section 404 Regional General Permit. Indiana Department of Environmental Management (IDEM) Section 401/United States Army Corps of Engineers (USACE) Section 404 Nationwide Permit Indiana Department of Natural Resources (IDNR) Construction in a Floodway Permit with Replacement-in-Kind Worksheet, excluding hydraulic analysis and modeling Indiana Department of Natural Resources (IDNR) Construction in a Floodway Permit including hydraulic analysis and modeling IDEM Construction Stormwater General Permit (Formally Rule 5) County Regulated Drainage Permit Federal Aviation Administration Permit Other (i.e. US Coast Guard Permit, IDEM Section 10, etc.): Coordination for the Acquisition of mitigation credits The CONSULTANT shall track the status of permits and permit expiration dates to determine if valid permits will be available for the current project construction schedule. If the CONSULTANT is requested or required to assist the LOCAL PUBLIC AGENCY in securing a permit not selected above, the work to provide such assistance shall be considered a change in the scope of the work. If additional permitting, outside the scope listed above, is required, fees shall be negotiated in good faith at the time under a Supplemental Agreement of this contract. Environmental mitigation design, implementation, or acquisition of mitigation credits are not included in this agreement. If they become necessary, fees shall be negotiated in good faith at the time under a Supplemental Agreement of this contract.
Environmental Permitting. In Phase I, Ameren (in cooperation with the Alliance) submitted air and water permits to IEPA. In Phase II, the Alliance will work with Ameren to revise the permit applications to reflect design changes in the project and address any questions or requests for additional information regarding the permit applications. The Alliance will also participate in any public hearings with respect to the requested permits. The project environmental and construction permit process will continue following the successful completion of the NEPA EIS.
Environmental Permitting. MDEQ agrees to expedite issuance of all permits required for the Project to the extent allowed by applicable law and regulation, upon timely receipt of completed permit applications.
Environmental Permitting. 3.2.1 Commencing no later than January 1, 1999, Georgia Power shall take all steps reasonably necessary to obtain all environmental permits necessary to construct and operate the Units adjacent to the Georgia Integrated Transmission System for at least the number of hours, at the rate of output and for the Term contemplated by this Agreement ("Required Environmental Permits"). Georgia Power shall pursue such permitting efforts diligently. At any time on or before March 1, 1999, Georgia Power may terminate this Agreemenx xxxx xxxxxx xxxxxx xo LEM and providing to LEM written evidence from duly authorized representatives of a Governing Authority that (i) it will impose requirements more restrictive than [redacted] while operating on natural gas or (ii) it likely will deny the issuance of a Required Environmental Permit. Such written evidence shall be interpreted in the context of similar written evidence or correspondence produced by duly authorized representatives of Georgia Power. In the event Georgia Power gives such notice and provides such evidence on or before March 1, 1999, Georgia Power shall have the right to terxxxxxx xxxx Xxxxxxxxx on or before March 1, 1999, upon payment to LEM of [redacted]. Upon payment of any such liquidated damages, Georgia Power shall have no further obligation or liability under this Agreement.
Environmental Permitting. The City of Arlington (City) proposes to construct the extension of the River Legacy Trail including two pedestrian bridges and a retaining wall near the West Fork Trinity River. This scope assumes that the proposed project can be designed and located to meet the terms and conditions of Section 404 Nationwide Permit 14, Linear Transportation Crossings without requiring a pre-construction notification (PCN) to the U.S. Army Corps of Engineers. In the event one is required, a PCN will be provided as an additional service. Additionally, it is assumed that the proposed project will require environmental clearance from TXDOT. Given this information, the following environmental permitting tasks are proposed:
AutoNDA by SimpleDocs
Environmental Permitting. (Exeltech) For this task, Consultant will:
Environmental Permitting. JACOBS will perform a Preliminary Jurisdictional Determination (PJD) for Section 404 waters of the U.S. (including wetlands) for the project and prepare and coordinate a U.S. Army Corps of Engineers (USACE) Nationwide Permit (NWP) 31 Preconstruction Notification (PCN) document. This proposal is valid for a period of 30 days. WATERS OF THE UNITED STATES / WETLAND INVESTIGATION
Environmental Permitting. 31.4. ANP may extend or suspend the lapse of the contract term in case of evidenced delay in the permitting procedure due to exclusive fault of the applicable environmental authorities.
Time is Money Join Law Insider Premium to draft better contracts faster.