ENGINEERING WORK Sample Clauses

ENGINEERING WORK. The Contractor shall properly and accurately lay out the work, perform all engineering work, and furnish all engineering materials and equipment required to establish and maintain all lines, grades, dimensions and elevations called for in the drawings or required in the progress of construction, unless otherwise noted in the contract documents. The Contractor will be held definitely and absolutely responsible for any errors in lines, grades, dimensions and elevations and shall at once, on instruction from the Project Manager, correct and make good such errors or any errors, or faults in the work resulting from errors in engineering performed under the requirements of its contract to the entire satisfaction of the Project Manager. Full compensation for the work shall be included in the prices paid for contract items of work. No additional allowance will be made for the correction of incorrect engineering work.
AutoNDA by SimpleDocs
ENGINEERING WORK. The DHHL may engage the Consultants for limited construction observations to supplement the inspections performed by the State and respective Counties. The Consultant’s authority shall be as described in the DHHL Interim General Conditions 5.4.
ENGINEERING WORK. 2.1. Subject to the terms and conditions of the Agreement and any delays caused by Uncontrollable Conditions, promptly after the Closing Date of the Agreement, Vendor shall commence the Engineering Work required to, where applicable, assess, evaluate, plan and tender the work necessary to complete the Relocation/Demolition Work set out in Section 4.2 below.
ENGINEERING WORK. STATE OF HAWAII
ENGINEERING WORK. As part of Contractor's design and engineering services, Contractor will prepare heat and material balances and design calculations, prepare flow and process diagrams, and one-line diagrams, prepare electrical, structural, foundation, piping and instrument drawings, prepare general arrangement drawings and plot plans for the Facility, make drawings and prepare specifications of all equipment and materials and prepare the other Drawings and Specifications required in order to comply with Good Industry Practices in the performance of the Work, including all interconnections, and furnish necessary technical and Quality Control inspection services. Such engineering services shall include a review and approval of the engineering of the HRSG and its auxiliary equipment.
ENGINEERING WORK. As of the Effective Date, the engineering work for the Infrastructure Work as described in Schedule 2.5.2(B) (the “Engineering Work”) and for the Monument Trailhead Improvements (as defined below) have not commenced, and will not be commenced by Seller or Master Developer. From and after the Effective Date, Buyer shall have the right to and shall be responsible for pursuing and negotiating any and all engineering, architect and other consultant contracts necessary for the Engineering Work (collectively, the “Engineering Contracts”). The cost of the engineering work for the Monument Trailhead Improvements shall be reimbursed to Buyer from the Monument Trailhead Subaccount (as described in Section 6.7.2 below). Xxxxx’s pursuit and submission of any Engineering Work at any time prior to the Phase 2 Closing shall be subject to Seller’s prior review and approval pursuant to the Seller Review Standard (it being agreed that Seller’s approval rights under this Agreement shall terminate as of the Phase 2 Closing). 6.2

Related to ENGINEERING WORK

  • Engineering Services Definition: Engineering Services includes any service or creative work, the adequate performance of which requires education, training and experience in the application of special knowledge in consulting, investigating, evaluating, planning and designing, engineering principles. Engineering Services covered by the Xxxxxx Architect-Engineers Act (40 U.S.C. 1102) are not covered in the primary scope of OASIS SB. Examples: Service areas that are included under the Engineering Services discipline include, but are not limited to the following:

  • THE WORK The Work comprises the completed construction required by the Contract Documents and includes all labor necessary to produce such construction, and all materials and equipment incorporated or to be incorporated in such construction.

  • Project Schedule Construction must begin within 30 days of the date set forth in Appendix A, Page 2, for the start of construction, or this Agreement may become null and void, at the sole discretion of the Director. However, the Recipient may apply to the Director in writing for an extension of the date to initiate construction. The Recipient shall specify the reasons for the delay in the start of construction and provide the Director with a new start of construction date. The Director will review such requests for extensions and may extend the start date, providing that the Project can be completed within a reasonable time frame.

  • Project Scope The physical scope of the Project shall be limited to only those capital improvements as described in Appendix A of this Agreement. In the event that circumstances require a change in such physical scope, the change must be approved by the District Committee, recorded in the District Committee's official meeting minutes, and provided to the OPWC Director for the execution of an amendment to this Agreement.

  • Development Work The Support Standards do not include development work either (i) on software not licensed from CentralSquare or (ii) development work for enhancements or features that are outside the documented functionality of the Solutions, except such work as may be specifically purchased and outlined in Exhibit 1. CentralSquare retains all Intellectual Property Rights in development work performed and Customer may request consulting and development work from CentralSquare as a separate billable service.

  • Project Completion Part 1 – Material Completion

  • Tenant Improvements Subject to the terms and conditions hereof, Landlord agrees, at its cost and expense to complete a “turnkey” interior build-out (“Tenant Improvements”) of the Leased Premises in accordance with the conditions stated in the Work Letter attached hereto as Exhibit C and incorporated hereby pursuant to the Approved Final Plans to be finalized and approved in accordance with the Work Letter and upon approval attached thereto. Any changes or modifications to the Approved Final Plans thereafter must be done in writing and signed by both Tenant and Landlord in accordance with the Work Letter. So long as in accordance with Article 19 of this Lease, Tenant agrees that Landlord shall be entitled to select, in its reasonable discretion and acting in good faith, all architects, engineers, contractors and material suppliers necessary to furnish the labor and materials for the construction of the Tenant Improvements. Landlord shall be the sole contracting party with respect to the employment of contractors which perform the work necessary to construct the Tenant Improvements. Tenant shall not be entitled to access to the Leased Premises prior to the Date of Substantial Completion and Tenant shall not interfere with or impair in any material way the construction of the Tenant Improvements, and any such interference or impairment shall be included within a Tenant Delay as defined in the Work Letter and shall entitle Landlord to all remedies provided herein for breach of this Lease. Prior to the Possession Date, Tenant shall not enter into any contract for construction of any improvements within the Leased Premises with any person other than Landlord without Landlord's prior written consent. Tenant, at Tenant's expense, shall obtain and maintain any and all necessary permits and licenses to enable Tenant to conduct Tenant’s Permitted Use, and the failure of Tenant to obtain or maintain same shall not in any manner affect the Tenant’s obligations hereunder. Landlord shall be solely responsible, at its cost and expense, for obtaining all permits and approvals related to the Tenant Improvements.