Duration of Technical City Permits Sample Clauses

Duration of Technical City Permits. The duration of Technical City Permits issued by the City, and any extensions of the time period during which such Technical City Permits remain valid, shall be established in accordance with the Technical Codes in effect at the time that the Technical City Permits are issued. Subject to Section 3.4, the lapse or expiration of a Technical City Permit shall not preclude or impair Developer from subsequently filing another Technical Permit Application for the same matter during the Term of this Agreement, which shall be processed by the City in accordance with the provisions of this ARTICLE 7. Notwithstanding anything to the contrary in this Agreement, if Xxxxxxxxx obtains building permits for the Project and, at any time after the Outside Building Permit Issuance Date, such building permits expire or are revoked pursuant to the applicable terms of the SMMC (as the same may be amended from time to time), then Developer may not subsequently apply for new building permits for the Project without first obtaining the prior written consent of the Planning Director, which may be granted or withheld in the Planning Director’s sole discretion.
AutoNDA by SimpleDocs
Duration of Technical City Permits. The duration of Technical City Permits issued by the City, and any extensions of the time period during which such Technical City Permits remain valid, shall be established in accordance with the Technical Codes in effect at the time that the Technical City Permits are issued. Subject to Section 3.3, the lapse or expiration of a Technical City Permit shall not preclude or impair Developer from subsequently filing another Technical Permit Application for the same matter during the Term of this Agreement, which shall be processed by the City in accordance with the provisions of this ARTICLE 7.
Duration of Technical City Permits. The duration of Technical City Permits issued by the City, and any extensions of the time period during which such Technical City Permits remain valid, shall be established in accordance with the Technical Codes in effect at the time that the Technical City Permits are issued. Subject to the terms of the next sentence, the lapse or expiration of a Technical City Permit shall not preclude or impair MINI of Santa Xxxxxx from subsequently filing another Technical Permit Application for the same matter during the Term of this Agreement, which shall be processed by the City in accordance with the provisions of this ARTICLE 7. Notwithstanding anything to the contrary in this Agreement, if MINI of Santa Xxxxxx obtains building permits for the Project and, at any time after the Outside Construction Start Date, such building permits expire or are revoked pursuant to the applicable terms of the SMMC (as the same may be amended from time to time), then MINI of Santa Xxxxxx xxx not subsequently apply for new building permits for the Project without first obtaining the prior written consent of the Planning Director, which may be granted or withheld in the Planning Director’s sole discretion.

Related to Duration of Technical City Permits

  • Intellectual Property Rights in Construction Documents, Drawings, and Models The drawings, Specifications and other documents prepared by the Design Professional pursuant to this Contract (including, without limitation, the Construction Documents), are the property of the Owner, whether or not the Project for which they are made commences or completes construction. Neither the Contractor nor any Subcontractor or material or equipment supplier shall own or claim a copyright in such drawings, Specifications, and other similar or related documents; Owner shall retain all common law, statutory, and other intellectual property rights with respect thereto. The Contractor must deliver remaining copies of such documents to the Owner upon request or upon completion of the Work, except that the Contractor may keep one copy of such documents for its files. The Contractor shall only use such drawings, Specifications and other documents for this Project. Neither the Contractor nor any Subcontractor or material or equipment supplier may use such drawings, Specifications, and other documents on other projects without the specific written consent of the Owner. All models are the property of the Owner.

  • Selection of Subcontractors, Procurement of Materials and Leasing of Equipment The contractor shall not discriminate on the grounds of race, color, religion, sex, national origin, age or disability in the selection and retention of subcontractors, including procurement of materials and leases of equipment. The contractor shall take all necessary and reasonable steps to ensure nondiscrimination in the administration of this contract.

  • Incorporation of Terms in Subcontracts a. Grantee will include in all its contracts with subrecipient subcontractors and solicitations for subrecipient subcontracts, without modification (except as required to make applicable to the subcontract):

  • Application of General Conditions These General Conditions set forth the terms and conditions generally applicable to the Development Grant Agreement to the extent and subject to any modifications set forth in such agreement.”

  • OBLIGATIONS AND ACTIVITIES OF CONTRACTOR AS BUSINESS ASSOCIATE 1. Contractor agrees not to use or further disclose PHI County discloses to Contractor other than as permitted or required by this Business Associate Contract or as required by law.

  • PARKING PERMITS A. Must be obtained on the day of move in.

  • COMPLIANCE WITH LAWS, LICENSES, PERMITS, AND INSURANCE POLICIES A. For each Term of this Agreement, Concessionaire shall obtain, pay for, maintain, and comply with all licenses, permits, certifications, authorizations, approvals, or any other documents required by all applicable government agency having jurisdiction over the Concession Premises or the conduct of Concessionaire's operations thereon. Concessionaire shall provide Department with written evidence that such applicable licenses, permits, authorizations, or other required documents have been obtained prior to commencement of the activity or operation covered by the license, permit, authorization, or other documentation. No operation shall begin until Concessionaire has provided such written evidence to Department.

  • Grant and Scope of License 2.1 Subject to Licensee’s compliance with the License Agreement, and except as otherwise stated herein, Licensor hereby grants Licensee a non-exclusive, revocable and non-transferrable license to:

  • CONFIDENTIALITY AND INTELLECTUAL PROPERTY RIGHTS 3.1 Any License Key to the Software is the confidential information of Wowza.

  • Permits, Licenses, and Inspections The Owner shall cooperate with the Contractor in obtaining building and other permits, licenses, and inspections. See also Subparagraph 2.1.2.2.3 and Article 2.1.5.

Time is Money Join Law Insider Premium to draft better contracts faster.