Development Period Sample Clauses

Development Period. The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period.
AutoNDA by SimpleDocs
Development Period. The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period. “Construction of Balance Work of the 4-laning of the Section from Xxxxxx to Demow of NH-37 (Old): Pkg-II: Road Works from Km 501+800 to Km 514+800 (13.000 Km), under SARDP- NE , under EPC Mode Mar 2024 Article 10 Design and Construction of the Project Highway
Development Period. 4.1 During the Development Period, the Independent Consultant shall undertake a detailed review of the Drawings to be furnished by the Concessionaire along with supporting data, including the investigations, characteristics of materials from borrow areas and sites and topographical surveys. The Independent Consultant shall complete such review and send its comments/observations to the CHB and the Concessionaire within 15 (fifteen) days of receipt of such Drawings. In particular, such comments shall specify the conformity or otherwise of such Drawings with the Scope of the Project and Specifications and Standards.
Development Period. The Contractor may commence pre-construction activities like utility shifting, boundary wall construction or any other activity assigned to the Contractor by the Authority to enable construction of the Project Highway immediately after signing of the Agreement, to the extent that such work is ready for execution. The Parties agree that these works may be taken up and completed to the extent feasible by the Contractor, before declaration of the Appointed Date, but no claim against the Authority for delay shall survive during this period and that the undertaking of these works by the Contractor shall not count towards the Scheduled Construction Period of the project which starts counting only from the Appointed Date. No construction activity of the Project Highway shall be undertaken during the development period. Contract AgreementPage 61 of 152 “Construction of Four Lane Panchgram Bypass from Design Chainage km 15+500 on NH- 37 (Old NH-53) at Kalinagar Pt.-II Village to Design Chainage km 27+300 at crossing with NH-6 (Old NH-44) Near Xxxxxxxxx Pt.-I Village in the State of Assam on EPC Mode under Xxxxxxxxxx Xxxxxxxxxx in Economic Corridors (Project Length – 11.8 km)” (3rd Call) Mar 2023 Article 10 Design and Construction of the Project Highway 10.1 Obligations prior to commencement of Works (i) Within 20 (twenty) days of the Appointed Date, the Contractor shall: (a) appoint its representative, duly authorised to deal with the Authority in respect of all matters under or arising out of or relating to this Agreement; (b) appoint a design director (the “Design Director”) who will head the Contractor’s design unit and shall be responsible for surveys, investigations, collection of data, and preparation of preliminary and detailed designs; (c) undertake and perform all such acts, deeds and things as may be necessary or required before commencement of Works under and in accordance with this Agreement, the Applicable Laws and Applicable Permits; and (d) make its own arrangements for quarrying of materials needed for the Project Highway under and in accordance with the Applicable Laws and Applicable Permits. (ii) The Authority shall, appoint an engineer (the “Authority’s Engineer”) before the Appointed Date to discharge the functions and duties specified in this Agreement, and shall notify to the Contractor the name, address and the date of appointment of the Authority’s Engineerforthwith. (iii) Work Programme (A) Within 30 (thirty) days of the Appointed Date, the...
Development Period studies preliminary to the Development project; - planned Drilling; - necessary plant and equipment; - dimensions of structures and other necessary facilities; - proposed professional training programme;
Development Period. The successful developer is required to sign the agreement within 3 months from the date of NoA complying with the conditions set out in the tender document and to obtain all requisite approvals including Environmental Clearance within a period of 6 months starting from the date of NoA. The development period shall be 60 months which shall include the period of 6 months for obtaining requisite approvals.
Development Period. The term "Development Period" means the period ------------------ commencing on the date of this Agreement and terminating on the date which is three (3) months after the Completion Date.
AutoNDA by SimpleDocs
Development Period. 2.1 In consideration of Penwest's entering into this Agreement, Mylan shall pay Penwest upon the Effective Date a nonrefundable initial fee of ************.
Development Period. (i) During the Phase 1 Development Period, ISU shall be responsible for and shall use Commercially Reasonable Efforts to (1) conduct Clinical Development of the Product in accordance with the Development Plan; and (2) the preparation and submission of Regulatory Materials for the Product in the Territory. ISU shall bear any and all costs and expenses of Clinical Development of the Product during the Phase 1 Development Period, including, without limitation, any and all costs and expenses incurred by the Parties to develop and support Regulatory Materials for the Product.
Development Period. 2.1 During the Development Period, the Independent Engineer shall undertake a detailed review of the Drawings to be furnished by the Concessionaire along with supporting data, including the geo-technical and hydrological investigations, characteristics of materials from borrow areas and quarry sites, topographical surveys and traffic surveys. The Independent Engineer shall complete such review and send its comments/observations to the Concessioning Authority and the Concessionaire within 15 (fifteen) days of receipt of such drawings. In particular, such comments shall specify the conformity or otherwise of such Drawings with the Scope of the Project and Specifications and Standards.