BIO Sample Clauses

BIO. Provide a Bio of yourself, telling us a little about yourself. Things like where you go to school, your hobbies, pets, family etc.
AutoNDA by SimpleDocs
BIO. HOSPITAL shall indemnify and hold ISOTRON, its successors and assignees harmless from and against any and all claims of liability, loss, damage, cost or expense (including reasonable fees for attorneys) relating to the BIO-HOSPITAL part of production, the marketing, distribution, sale and use of the Goods.
BIO. WEST will utilize ENG Form 4345 for the permit application and attach the following: • Applicant and Applicant’s Agent Name and Contact InformationProject Description (nature of the activity, project purpose, reason(s) for discharge, type(s) of material being discharged, surface area of wetlands or other waters, a description of avoidance, minimization, and compensation, and addresses of adjoining property owners) • Project Location Information • Description of Proposed Impacts • TCEQ Tier II Questionnaire • Threatened and Endangered Species Determination • Cultural Resource Assessment To address and calculate project impacts the wetland delineation information and the project plans from the engineer will be prepared. Additionally, the iHGM functional assessment will be prepared and included to identify the values of the existing features. Once the permit application is completed, BIO- WEST will forward an electronic copy of the application for review and comment. Following incorporation of comments, BIO-WEST will submit the completed application to the USACE Galveston 2017 Fort Bend County Mobility W. Sycamore Road Expansion May 11, 2021 Page 4 District for review. Based on previous conversations with the client, BIO-WEST understands the need to secure appropriate compensatory mitigation for the proposed project. Upon determination that impacts to jurisdictional areas are unavoidable and will require mitigation BIO-WEST will immediately begin discussions with qualified mitigation solution companies in order to seek out mitigation credits. BIO- WEST will work in order to secure the appropriate mitigation option that best suites the needs of the proposed project.
BIO. RAD shall (i) evaluate and determine in good ----------------- faith whether regulatory approval is required in each country in which it elects to market or distribute the Kits and/or BIO-RAD Systems for use within the Fields and shall obtain all regulatory approvals BIO-RAD so determines are required for such marketing and distribution; and (ii) have sold Kits for which a royalty is owed pursuant to Section 4.6(c) (including a Kit within Field Four) and have commenced marketing, distribution and commercial sale of BIO-RAD Systems, in each of (i) and (ii) within [**] months after the availability of the Luminex100 System. BIO-RAD shall have [**] days to file regulatory approvals which BIO-RAD determined in its good faith judgment were not required but with respect to which BIO-RAD was later notified by the applicable government agency were required. Failure by BIO-RAD to comply with (i) and (ii) with respect to Field Four shall give LUMINEX the right at its sole election to terminate [**] of Article 3.2 (b) by written notice to BIO-RAD, except to the extent caused solely by LUMINEX's failure to supply Standard Beads or Luminex100 Systems in accordance with the terms hereof or the Development Agreement.
BIO. Vascular shall cause the Bio-Vascular Consolidated Returns to include and reflect the activities, transactions and operations of Vital Images for all Pre-Closing Periods.
BIO. Xxxx-Xxxxxxx Xxxxxx, is a sound editor, recordist and studio technician living in Canada where he works on Xxxx Xxxxxx’x Air Xxx franchise after a stint in London at Heavy- Entertainment and on the set of Xxxxx Xxxxxx.
BIO. 2 The applicant shall comply with all Conditions of Approval, avoidance measures, and terms and conditions set forth in the required federal and State permits issued for the project including the U.S.
AutoNDA by SimpleDocs
BIO. S” (trigeneration using renewable energy sources: biomass and solar thermodynamics) proposed by XXXX, which has developed a chain of solar energy plants in Italy based on the concept of solar thermodynamics. The plant will be built and managed by Enel Green Power, world leader in the development and management of renewable sources and technological innovation in the field of green energy, thanks to the commitment made by Roma Capitale through the signing of the Aalborg Charter, which involves making commitments and taking practical action at a local level for the sustainable development of urban areas, and the Covenant of Mayors launched by the EU Commission, aimed at reducing greenhouse gas emissions. Trebios is a small-scale, modular, polygeneration concentrated solar power plant that will ensure the continuous production of electricity (1-5 MWe) and process steam, as well as integrate and, thus, enhance the renewable resources of sunlight and biomass that are widely available in the municipal area. This biomass will initially be treated with the process steam generated by the plant itself, to separate its components, firstly lignin, which can also be used in gaseous form in the auxiliary molten salts heater to support electricity generation in the absence of sunlight (for example on overcast days), providing about 40% of the total, then the cellulosic components, which are subjected to a fermentation process that produces ethanol, a fuel that can be used in internal combustion engines, contributing to sustainable public transport. The plant will therefore be capable of generating electricity 24 hours a day , at night and on overcast days, with zero-CO2-emissions, from renewable sources only, including the prunings from the city’s trees, which will be transformed into both electricity and biofuel for use in public transport vehicles. Biomass may also be obtained from the vast farming and forestry resources available in what is Italy’s largest municipality. The exploitation of this biomass ”waste” could have a major economic impact by significantly increasing the income of agri-businesses, giving a vital boost to enterprises previously dismissed as marginal. The Trebios project marks an important stepping stone on the way to reducing CO2 emissions and the environmental impact of urban mobility, a commitment already made by the Enel Group through the agreement signed with Roma Capitale and ACEA to develop a network of interoperable recharge points for elec...
BIO. Xxxxx Xxxxxxxx uses her background in public policy, communications, events and campaigns to develop comprehensive strategies for her clients. She is an experienced and dedicated manager who develops communications and public affairs strategies; facilitates meetings and retreats; trains and coaches executives; provides organizational and communications counsel and writes numerous types of documents for her clients. Over the past 25 years, Xxxxx has worked in many arenas. She worked on three Democratic presidential campaigns and in the Clinton Administration, organizing trips and events like the 1997 G-8 Summit and the 50th Anniversary of NATO. She was a small business owner, co- founding Pyramid Communications, a Seattle-based public affairs company that specializes in environmental, health and Native American issues. She served as staff director for the Senate Democratic Technology and Communications Committee under Senator Xxxxxxx working with the Democratic Caucus on their TV, Radio and Internet strategies. Xxxxx spent four years working as a consultant to the Athens 2004 Olympic Games providing communications expertise; building their press office; and serving as a spokesperson and advisor to the President of the Athens Olympic Organizing Committee. Xxxxx also was the first Executive Director of First Lady Xxxxxxxx Xxxxx’x children’s anti-obesity initiative, Let’s Move! Robin’s past and present clients include the Bipartisan Policy Center, the Office of Military Community and Family Policy at the Department of Defense, the Aspen Institute, the Xxxxxx Foundation, the National Wildlife Federation and other non-profit organizations. Xxxxx is a public speaker and was instrumental in the writing of the report, Lots to Lose: How America’s Health and Obesity Crisis Threatens America’s Future. Contact Information: Xxxxx Xxxxxxxx 000-000-0000
BIO. Ved shall furnish semi-annual volume projections after every six months to enable Kancor to make suitable arrangements for manufacture and supply to Bio-Ved. The details of the supply of the minimum quantity of the four products mentioned in "Schedule 1" will be specified in the addendum to this agreement by 1st July, 1998.
Time is Money Join Law Insider Premium to draft better contracts faster.