Basic Elements of the Project Sample Clauses

Basic Elements of the Project. Reflecting Xxxxxxxx Corporation ideals and the goal of continually increasing the efficiency of their manufacturing operations, the Bayport Facility is committed to source reduction, materials substitution, recycling and pollution control (in descending order of preference). The Bayport Facility commits to continue its environmental stewardship efforts over the ten-year life of this Project XL pilot. The Andersen commitments contained in this FPA will promote a positive overall impact on the environment, the local community, and employee health and safety.
AutoNDA by SimpleDocs
Basic Elements of the Project. 2.1. The Project area The Project area is defined as the island of Malta, with particular focus on the Northwest area. The project will deal with selected priority issues, and present relevant solutions and outputs at the island level, when related to general policies and strategies, and at the level of the NW part, when related to detailed plans, actions and solutions. The above approach will be implemented in accordance with the nature and objectives of each individual Project activity, as presented further on in Chapter 3 and 4. The Project area, as defined above, is presented in Figure 1.
Basic Elements of the Project 

Related to Basic Elements of the Project

  • of the Project III. 2 – Performance obligations

  • Duration of the Project includes the time from the beginning of the work on the Project until the Contractor's/person's work on the Project has been completed and accepted by the Owner.

  • CONSTRUCTION OF THE PROJECT The Allottee has seen the proposed layout plan, specifications, amenities and facilities of the Apartment/ Plot and accepted the floor plan, payment plan and the specification, amenities and facilities annexed along with this Agreement which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the said layout plans, floor plans and specifications, amenities and facilities. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the bye-laws, FAR, and density norms and provisions prescribed by the relevant building bye-laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act, and breach of this term by the Promoter shall constitute a material breach of this Agreement.

  • Development of the Project 4.1 TSP's obligations in development of the Project: Subject to the terms and conditions of this Agreement, the TSP at its own cost and expense shall observe, comply with, perform, undertake and be responsible:

  • MAINTENANCE OF THE PROJECT (11-20-07) (Rev. 1-17-12) 104-10 SP1 G125 Revise the 2012 Standard Specifications as follows: Page 1-35, Article 104-10 Maintenance of the Project, line 25, add the following after the first sentence of the first paragraph: All guardrail/guiderail within the project limits shall be included in this maintenance. Page 1-35, Article 104-10 Maintenance of the Project, line 30, add the following as the last sentence of the first paragraph: The Contractor shall perform weekly inspections of guardrail and guiderail and shall report damages to the Engineer on the same day of the weekly inspection. Where damaged guardrail or guiderail is repaired or replaced as a result of maintaining the project in accordance with this article, such repair or replacement shall be performed within 7 consecutive calendar days of such inspection report. Page 1-35, Article 104-10 Maintenance of the Project, lines 42-44, replace the last sentence of the last paragraph with the following: The Contractor will not be directly compensated for any maintenance operations necessary, except for maintenance of guardrail/guiderail, as this work will be considered incidental to the work covered by the various contract items. The provisions of Article 104-7, Extra Work, and Article 104-8, Compensation and Record Keeping will apply to authorized maintenance of guardrail/guiderail. Performance of weekly inspections of guardrail/guiderail, and the damage reports required as described above, will be considered to be an incidental part of the work being paid for by the various contract items.

  • Construction Development of the Project The Allottee has seen the proposed layout plan/demarcation-cum-zoning/sanctioned plans, / site plan / building plan, specifications, amenities and facilities, etc. depicted in the advertisement / brochure / agreement / website (as the case may be) regarding the Project where the Said Independent Floor for residential usage along with parking is located and has accepted the floor / site plan, Payment Plan and the specifications, amenities, facilities, etc. [annexed along with this Agreement] which has been approved by the competent authority, as represented by the Promoter. The Promoter shall develop the Project in accordance with the bye-laws such as Haryana Building Code, 2017, FAR, density norms, provisions prescribed, approved plans, terms and condition of the license/ allotment as well as registration of RERA, etc. Subject to the terms in this Agreement, the Promoter undertakes to strictly abide by such plans approved by the competent authorities and shall also strictly abide by the provisions and norms prescribed by the relevant State laws and shall not have an option to make any variation/ alteration/ modification in such plans, other than in the manner provided under the Act and Rules made thereunder or as per approvals/instructions/ guidelines of the competent authorities, and any breach of this term by the Promoter shall constitute a material breach of the Agreement.

  • Completion of the Project The Contracting Party shall complete the construction, equipping and furnishing of the Improvements in accordance with the Plans and submit to the Board a Certificate of Completion on or before November 1, 2016.

  • MAINTENANCE OF THE SAID BUILDING / APARTMENT / PROJECT The Promoter shall be responsible to provide and maintain essential services in the Project till the taking over of the maintenance of the project by the association of the allottees. The cost of such maintenance has been included in the Total Price of the [Apartment/Plot]. [Insert any other clauses in relation to maintenance of project, infrastructure and equipment]

  • Description of the Project THIS SHOULD BE NO MORE THAN A TWO PARAGRAPH DESCRIPTION THAT PROVIDES A BACKGROUND OF THE PROBLEM, AS WELL AS HOW THE CONTRACTOR INTENDS TO SOLVE THE PROBLEM. KEEP IN MIND THAT THE CONTRACT SHOULD “STAND ON ITS OWN,” I.E. ANYONE SHOULD BE ABLE TO PICK IT UP AND FIGURE OUT WHAT IS GOING ON.)

  • Scope of the Project Under this Agreement, the scope of the Project (the “Scope of the Project”) shall mean and include:

Time is Money Join Law Insider Premium to draft better contracts faster.