Back-Translation and Programme Changes Sample Clauses

Back-Translation and Programme Changes. 6.1 As a matter of principle, the licensee may not make any changes to the software product unless this is necessary to correct errors. The prerequisite is that this is done solely for the purpose of cor- recting errors that impair the functioning of the software. In the latter case and if important program functions and working methods could be disclosed during the repair process, the licensee may commission a commercially active third party to carry out the repair if this third party is not a potential competitor of the licensor.
AutoNDA by SimpleDocs

Related to Back-Translation and Programme Changes

  • Technical Standards Applicable to a Wind Generating Plant i. Low Voltage Ride-Through (LVRT) Capability A wind generating plant shall be able to remain online during voltage disturbances up to the time periods and associated voltage levels set forth in the standard below. The LVRT standard provides for a transition period standard and a post-transition period standard.

  • Project Changes 1.8.1. All changes shall be administered per the UGC.

  • INTEGRATIONS & MODIFICATIONS This Agreement constitutes the whole agreement between the parties. Except as identified in this Agreement, there are no other prior written agreements and no prior or contemporaneous oral agreements that are a part of this Agreement. No modification to this Agreement shall be valid, unless in writing and executed by both parties.

  • Contract Changes Changes may not be made in the terms and conditions of this contract without the agreement and written permission of the Director of Housing.

  • OGS Centralized Contract Modifications OGS, an Authorized User, or the Contractor may suggest modifications to the Centralized Contract or its Appendices. Except as specifically provided herein, modifications to the terms and conditions set forth herein may only be made with mutual written agreement of the Parties. Modifications may take the form of an update or an amendment. “

  • Product Changes Vocera shall have the right, in its absolute discretion, without liability to End User, to update to provide new functionality or otherwise change the design of any Product or to discontinue the manufacture or sale of any Product. Vocera shall notify End User at least 90 days prior to the delivery of any Product which incorporates a change that adversely affects form, fit or function (“Material Change”). Vocera shall also notify End User at least 90 days prior to the discontinuance of manufacture of any Product. Notification will be made as soon as reasonably practical for changes associated with regulatory or health and safety issues.

  • Master Contract Sales Reporting System Contractor shall report quarterly Master Contract sales in Enterprise Services’ Master Contract Sales Reporting System. Enterprise Services will provide Contractor with a login password and a vendor number. The password and vendor number will be provided to the Sales Reporting Representative(s) listed on Contractor’s Bidder Profile.

  • NETWORK CHANGES 3.1. Sprint shall provide notice of network changes and upgrades in accordance with §§ 51.325 through 51.335 of Title 47 of the Code of Federal Regulations. Sprint may discontinue any interconnection arrangement, Telecommunications Service, or Network Element provided or required hereunder due to network changes or upgrades after providing CLEC notice as required by this Section. Sprint agrees to cooperate with CLEC and/or the appropriate regulatory body in any transition resulting from such discontinuation of service and to minimize the impact to customers, which may result from such discontinuance of service.

  • Construction Change Directives 7.3.1 A Construction Change Directive is written order prepared by the Architect and signed by the Owner and Architect, directing a change in the Work and stating a proposed basis for adjustment, if any, in the Contract Sum, or Contract Time, or both. The Owner may by Construction Change Directive, without invalidating the Contract, order changes in the Work within the general scope of the Contract consisting of additions, deletions or other revisions, the Contract Sum and Contract Time being adjusting accordingly.

  • No Cost Change Request The Authorized User reserves the right to reasonably amend a Fixed-Price Deliverable, provided the amendment does not materially change the Scope of the Deliverable, without a cost increase. Although the Authorized User has endeavored to identify many tasks associated with a Fixed-Price Deliverable (Tasks), additional Tasks which can reasonably be anticipated to carry out the Deliverable shall be within the scope of the Deliverable, and shall not result in a cost increase. An Authorized User shall use Appendix F, Attachment 4, No Cost Change Request Template to reflect such modifications. Written approval of the No-Cost Change Request is required from both the Authorized User and the Contractor.

Time is Money Join Law Insider Premium to draft better contracts faster.