Allocation of Concession Area Risks Sample Clauses

Allocation of Concession Area Risks. Except as expressly set out in this Article 5, the Concessionaire shall be liable for all risks affecting the Concession Area, including any Pollution (excluding any Pollution existing at the Execution Date that was not either disclosed by the Grantor to the Concessionaire or which would have been reasonably expected to be revealed by an inspection on site) and geotechnical or soil risks, and the Concessionaire shall not be entitled to make any claim against the Grantor, and the Grantor will not be liable for any claim, arising out of or in connection with such risks.
AutoNDA by SimpleDocs

Related to Allocation of Concession Area Risks

  • MAINTENANCE OF CONCESSION PREMISES A. Concessionaire shall preserve and maintain the Concession Premises in good and clean condition, reasonable wear and tear excepted. Concessionaire is solely responsible for the maintenance and cleanliness of the Concession Premises.

  • Area of Concern Cracks in walkways and/or patios within property boundaries and/or driveway. Standard: Cracks that do not exceed an average of ½ inch in width and vertical displacement that does not exceed an average of ½ inch are to be expected. Developer or Initial Purchaser must immediately seal all cracks appearing with a waterproof substance.

  • Extension of Concession Period Subject to the provisions of Clause 35.6, in the event that a material default or breach of this Agreement set forth in Clause 35.2 causes delay in achieving COD or leads to suspension of or reduction in collection of Fee, as the case may be, the Authority shall, in addition to payment of compensation under Clause 35.2, extend the Concession Period, such extension being equal in duration to the period by which COD was delayed or the collection of Fee remained suspended on account thereof, as the case may be.

  • Early Construction of Base Case Facilities Developer may request Connecting Transmission Owner to construct, and Connecting Transmission Owner shall construct, subject to a binding cost allocation agreement reached in accordance with Attachment S to the ISO OATT, including Section 25.8.7 thereof, using Reasonable Efforts to accommodate Developer’s In-Service Date, all or any portion of any System Upgrade Facilities or System Deliverability Upgrades required for Developer to be interconnected to the New York State Transmission System which are included in the Base Case of the Class Year Study for the Developer, and which also are required to be constructed for another Developer, but where such construction is not scheduled to be completed in time to achieve Developer’s In-Service Date.

  • Substitution of Concessionaire At any time during the period of Suspension, the Lenders‟ Representative, on behalf of Senior Lenders, shall be entitled to substitute the Concessionaire under and in accordance with the Substitution Agreement, and upon receipt of notice thereunder from the Lenders‟ Representative, the Authority shall withhold Termination for a period not exceeding 180 (one hundred and eighty) days from the date of Suspension, and any extension thereof under Clause 36.1, for enabling the Lenders‟ Representative to exercise its rights of substitution on behalf of Senior Lenders.

  • SCOPE OF CONCESSION A. Concessionaire shall be granted, under a Concession Agreement (“Agreement”), the non- exclusive, revocable right to dispense food, non-alcoholic beverages, and novelties (hereinafter referred to as the “Concession Operation”) at Belleplain State Forest. Concessionaire’s operation shall be limited to the structure(s) or area(s) provided by Department for concession purposes and specifically designated in Exhibit A (hereinafter referred to as the “Concession Premises”).

  • BUILDER’S RISK FOR NEW CONSTRUCTION PROJECTS If the project is NEW CONSTRUCTION, then the following provisions apply:

  • Participating TO's Interconnection Facilities Construction The Participating TO's Interconnection Facilities shall be designed and constructed in accordance with Good Utility Practice. Upon request, within one hundred twenty (120) Calendar Days after the Commercial Operation Date, unless the Participating TO and Interconnection Customer agree on another mutually acceptable deadline, the Participating TO shall deliver to the Interconnection Customer and the CAISO the following “as-built” drawings, information and documents for the Participating TO's Interconnection Facilities [include appropriate drawings and relay diagrams]. The Participating TO will obtain control for operating and maintenance purposes of the Participating TO's Interconnection Facilities and Stand Alone Network Upgrades upon completion of such facilities. Pursuant to Article 5.2, the CAISO will obtain Operational Control of the Stand Alone Network Upgrades prior to the Commercial Operation Date.

  • BUILDER’S RISK FOR CONSTRUCTION RENOVATION PROJECTS If the project is CONSTRUCTION RENOVATION of an existing structure, and the State has already determined that Contractor will not be obligated to obtain and maintain Builder’s Risk insurance, then the following provisions apply:

  • Completion of Concrete Pours and Emergency Work 24.14.1 Except as provided in this sub-clause an employee shall not work or be required to work in the rain.